News · Infrastructure
Pune metro line update
By the Avasetu team · As of
Analysis of a news report, with our own check

Pune metro line 3 operates with 20 trains and 300 daily trips, with two new stations opening soon, according to Punekar News and Free Press Journal reports
Punekar News reported that line 3 of the Pune metro operates with a fleet of 20 trains, making about 300 trips daily
The train frequency is five minutes during peak hours and eight minutes during non-peak hours, as stated by Punekar News
Line 3 is a 23.3-km elevated corridor with 17 stations operational before the Balewadi openings, connecting Maan-Hinjewadi IT Park with Shivajinagar, according to Punekar News
Free Press Journal reported that Balewadi High Street and Balewadi Phata stations were scheduled to open for commuters
Four stations, including Baner Gaon and Bhosale Nagar, are still pending, as per Free Press Journal
Our article in our own words. The facts are from the reports named below.
Avasetu checked
- Param: 0.2 km away, 175 homes, possession 2028-04-30 (filed with MahaRERA)
- Paranjape Trident E F: 0.2 km away, 302 homes, possession 2027-12-31 (filed with MahaRERA)
- The Camelia Phase - 1: 0.4 km away, 426 homes, possession 2027-05-31 (filed with MahaRERA)
- Goel Ganga Pune Baner Project-Tower 3: 0.4 km away, 137 homes, possession 2030-10-29 (filed with MahaRERA)
- One 45: 0.4 km away, 126 homes, possession 2027-12-31 (filed with MahaRERA)
- Omicron Commerz Baner: 0.6 km away, 57 homes, possession 2031-04-30 (filed with MahaRERA)
From the Hinjawadi centre: Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park) 8 min at 9 am; Baner-Balewadi offices (Balewadi High Street) 15 to 27 min at 9 am; Hinjawadi Phase 2 (Rajiv Gandhi Infotech Park) 18 to 28 min at 9 am (Google, typical traffic).
37 projects being built within 2 km of the Hinjawadi centre, 12,684 homes, on our MahaRERA register.
From the Hinjawadi centre at 9 am, Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park) is 8 to 8 minutes by car (Google, typical traffic).
46 projects being built within 2 km of the Baner centre, 9,007 homes, on our MahaRERA register.
From the Baner centre at 9 am, Baner-Balewadi offices (Balewadi High Street) is 2 to 4 minutes by car (Google, typical traffic).
45 projects being built within 2 km of the Balewadi centre, 10,157 homes, on our MahaRERA register.
Our own facts, not from the report: projects from the MahaRERA register, measured from each project's map pin; drive times from Google Maps.
Worth checking: how far your shortlisted project is from this road or line.
Background
Pune metro line 3 is an elevated corridor connecting Maan-Hinjewadi IT Park with Shivajinagar
From our own area guide, not from the reports.
Our view
This update may matter to someone buying or renting a home in Pune as it could affect their daily commute, and the operational metro line may influence the decision to live in areas connected by the metro, potentially impacting property prices.
This is our own reading, not a fact from the source.
What to check
Buyers can verify the operational status of the metro line and its stations before making a decision. They can also check the train frequency and schedule to plan their daily commute.
Sources
As of 24 Nov 2026
Approvals and project status change, so check the sources before you decide. This is general information, not investment or legal advice.