Skip to main contentSkip to navigation
MahaRERA registered P52100052534Verify on MahaRERA (opens in a new tab)Mid stage

18 Magnitude, Tathawade

Sold as Punawale by 8 property sites; we list it under Tathawade (pincode 411033).

See the site from above today

by Gd Square Spaces · Tathawade, Mulshi, Pune district · 411033

Price
from ₹67.95 L
EMI about ₹47,175 a month
Possession
Apr 2029
completion filed with MahaRERA
Booked
298 of 504

What stands out

As of 20 Nov 2026, from MahaRERA and the sources below.

  • 59% of homes booked: MahaRERA shows 298 of 504 homes booked.
  • Buildings in this registration: 5, up to 28 floors.
  • 59% booked here; the middle of 74 Tathawade projects registered within a year of it is 53%.
  • Compared with other projects still being built in Tathawade: Compared with other projects still being built in Tathawade: its tallest building is higher than that of 82 of 121.
  • Completion date filed with MahaRERA: 28 Apr 2029.

Updated 22 Nov 2026

Price

  • Homes

    ₹67.95 L – ₹1.35 Cr

    Last checked 22 Nov 2026

    All-in cost of a home at ₹67.95 L: about ₹76.4 L
    Price (agreement value)₹67.95 L
    GST (5%)₹3.4 L
    Stamp duty (7%)₹4.76 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹76.4 L

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹47,175 a monthOn a ₹54.36 L loan (80% of ₹67.95 L) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Tathawade usually ask

  • 2 BHK about ₹70 – 90 L (39 projects)
  • 2.5 BHK about ₹90 L – ₹1.1 Cr (4 projects)
  • 3 BHK about ₹90 L – ₹1.3 Cr (38 projects)
  • 4 BHK about ₹1.3 – 2 Cr (7 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Tathawade, rounded. Use it to judge an offer, not as a price.

Tathawade average ₹10,852/sq ft across 19 projectsThe middle asking price per sq ft of other projects in Tathawade.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

18 Magnitude from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

18 Magnitude, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. 18 Magnitude from above, satellite picture of Nov 2022
    Nov 2022
  2. 18 Magnitude from above, satellite picture of Jan 2024
    Jan 2024
  3. 18 Magnitude from above, satellite picture of Feb 2025
    Feb 2025
  4. 18 Magnitude from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Little change, stable building footprints and shadows visible around the project pin.

Registered with MahaRERA Sep 2023 · possession filed for Apr 2029

Season by season, Jan 2022 to Oct 2026: 15 seasons, October to May (the monsoon is under cloud).

The ground around the project's map pin, seen by the Sentinel-2 satellite once each dry season from Jan 2021 to Oct 2026.

The seasons before

  1. Apr–May 2026Little change, construction footprints persist with minor ground modifications near the pin.
  2. Jan–Mar 2026Little change, established building footprints and shadows remain visible in the ring.
  3. Oct–Dec 2025New structures cast visible shadows within the ring indicating active construction.
Construction proof from space: Jan 2022 to Oct 2026, Copernicus Sentinel-2 (11 earlier seasons)
  1. Apr–May 2025Little change, continuing structural outlines and ground activity near the pin.
  2. Jan–Mar 2025Structures develop further with visible shadows and construction footprints in the ring.
  3. Oct–Dec 2024New building footprints and shadows emerge inside the ring following registration.
  4. Apr–May 2024Little change, ongoing clearing and foundation work visible around the ring.
  5. Jan–Mar 2024Ground disturbance and new footprints appear inside and near the ring.
  6. Oct–Dec 2023Work shows after the Sep 2023 registration with minor ground clearing near the ring.
  7. Apr–May 2023Little change, dry surroundings with established buildings dominating the ring view.
  8. Jan–Mar 2023Sparse vegetation and existing structures remain visible within the ring area.
  9. Oct–Dec 2022Little change, consistent ground features and existing buildings visible near the ring.
  10. Apr–May 2022Little change, retaining the dry layout and existing structures around the pin.
  11. Jan–Mar 2022Plant cover decreases slightly; existing structures persist inside the yellow ring.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)3.7 km
  • Baner-Balewadi High Street7.5 km
  • Pune Railway Station18.3 km
  • Pune Airport (Lohegaon)19.2 km

Nearby

  • SchoolAkshara International School & Junior College2.1 km
  • CollegeIndira College of Commerce & Science (ICCS)2.2 km
  • SchoolIndira National School2.4 km
  • TempleShani Mandir2.6 km
  • CollegeSri Balaji University, Pune (SBUP)2.9 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Amenities

  • CCTV installed in common areas.

Last checked 22 Nov 2026.

MahaRERA record

From MahaRERA, read 20 Nov 2026

Possession date

28 Apr 2029

The completion date filed with MahaRERA is 28 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 28 Dec 2028.

Beside other Tathawade projects

Worked out by Avasetu
Homes booked
59%
The middle of 74 Tathawade projects registered within a year of it: 53%.
Completion date
Not moved by the builder
53 of 233 Tathawade projects being built moved theirs 3 months or more.

From MahaRERA records read 20 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
298 of 504
Towers
5 in this registration
The tallest has 28 floors.
Units
504
500 homes, 4 shops or offices.
Registered on
8 Sep 2023
MahaRERA registration
P52100052534
Listed or updated on MahaRERA 30 Sep 2025.
Promoter (builder)
Gd Square Spaces
Project type
Others
Pincode
411033

Open the MahaRERA record (opens in a new tab)

Tower by tower

5 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
WING-A281040
WING-B161100
WING-C161100
WING-D161100
WING-E11664

As filed with MahaRERA (sanctioned floors).

Gd Square Spaces: track record

From MahaRERA records

Gd Square Spaces has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Tathawade

FAQ

What is the price of 18 Magnitude?

Homes from ₹67.95 L to ₹1.35 Cr, checked on 22 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of 18 Magnitude?

The completion date filed with MahaRERA is 28 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of 18 Magnitude?

18 Magnitude is registered with MahaRERA as P52100052534.

How many towers and floors does 18 Magnitude have?

MahaRERA lists 5 buildings, the tallest with 28 floors.

How many flats are there in 18 Magnitude?

MahaRERA lists 504 units (500 residential, 4 other).

How many homes in 18 Magnitude are booked?

298 of 504 homes were booked as per MahaRERA on 20 Nov 2026.

Who is the builder of 18 Magnitude?

The promoter registered with MahaRERA is Gd Square Spaces.

Where is 18 Magnitude?

18 Magnitude is in 411033, Mulshi, Pune district (pincode 411033).

Which school is nearest to 18 Magnitude?

Akshara International School & Junior College, about 2.1 km away in a straight line from the map position; the drive is longer.

How far is 18 Magnitude from Pune Airport?

About 19.2 km in a straight line from the map position; the drive is longer.

How far is 18 Magnitude from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 3.7 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to 18 Magnitude.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 30 Sep 2025

  • Dates and homes bookedFrom MahaRERA

    Checked 22 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 10 Nov 2026

  • Location and nearbyGathered and checked

    Checked 22 Nov 2026

  • DescriptionGathered and checked

    Checked 22 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (22 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (22 Nov 2026)

Get the price sheet and floor plans for 18 Magnitude

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment