18 Magnitude, Tathawade
Sold as Punawale by 8 property sites; we list it under Tathawade (pincode 411033).
See the site from above todayby Gd Square Spaces · Tathawade, Mulshi, Pune district · 411033
- Price
- from ₹67.95 L
- EMI about ₹47,175 a month
- Possession
- Apr 2029
- completion filed with MahaRERA
- Booked
- 298 of 504
What stands out
As of 20 Nov 2026, from MahaRERA and the sources below.
- 59% of homes booked: MahaRERA shows 298 of 504 homes booked.
- Buildings in this registration: 5, up to 28 floors.
- 59% booked here; the middle of 74 Tathawade projects registered within a year of it is 53%.
- Compared with other projects still being built in Tathawade: Compared with other projects still being built in Tathawade: its tallest building is higher than that of 82 of 121.
- Completion date filed with MahaRERA: 28 Apr 2029.
Updated 22 Nov 2026
Price
Homes
₹67.95 L – ₹1.35 Cr
Last checked 22 Nov 2026
All-in cost of a home at ₹67.95 L: about ₹76.4 L
Price (agreement value) ₹67.95 L GST (5%) ₹3.4 L Stamp duty (7%) ₹4.76 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹76.4 L
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹47,175 a monthOn a ₹54.36 L loan (80% of ₹67.95 L) at 8.5% for 20 years. Ask your bank for its rate.
What new homes in Tathawade usually ask
- 2 BHK about ₹70 – 90 L (39 projects)
- 2.5 BHK about ₹90 L – ₹1.1 Cr (4 projects)
- 3 BHK about ₹90 L – ₹1.3 Cr (38 projects)
- 4 BHK about ₹1.3 – 2 Cr (7 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Tathawade, rounded. Use it to judge an offer, not as a price.
Tathawade average ₹10,852/sq ft across 19 projectsThe middle asking price per sq ft of other projects in Tathawade.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
18 Magnitude from above, today
18 Magnitude, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.
Nov 2022 Jan 2024 Feb 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Oct–Dec 2026 (looked Nov 2026)
Little change, stable building footprints and shadows visible around the project pin.
Registered with MahaRERA Sep 2023 · possession filed for Apr 2029
The ground around the project's map pin, seen by the Sentinel-2 satellite once each dry season from Jan 2021 to Oct 2026.
The seasons before
- Apr–May 2026Little change, construction footprints persist with minor ground modifications near the pin.
- Jan–Mar 2026Little change, established building footprints and shadows remain visible in the ring.
- Oct–Dec 2025New structures cast visible shadows within the ring indicating active construction.
Construction proof from space: Jan 2022 to Oct 2026, Copernicus Sentinel-2 (11 earlier seasons)
- Apr–May 2025Little change, continuing structural outlines and ground activity near the pin.
- Jan–Mar 2025Structures develop further with visible shadows and construction footprints in the ring.
- Oct–Dec 2024New building footprints and shadows emerge inside the ring following registration.
- Apr–May 2024Little change, ongoing clearing and foundation work visible around the ring.
- Jan–Mar 2024Ground disturbance and new footprints appear inside and near the ring.
- Oct–Dec 2023Work shows after the Sep 2023 registration with minor ground clearing near the ring.
- Apr–May 2023Little change, dry surroundings with established buildings dominating the ring view.
- Jan–Mar 2023Sparse vegetation and existing structures remain visible within the ring area.
- Oct–Dec 2022Little change, consistent ground features and existing buildings visible near the ring.
- Apr–May 2022Little change, retaining the dry layout and existing structures around the pin.
- Jan–Mar 2022Plant cover decreases slightly; existing structures persist inside the yellow ring.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)3.7 km
- Baner-Balewadi High Street7.5 km
- Pune Railway Station18.3 km
- Pune Airport (Lohegaon)19.2 km
Nearby
- SchoolAkshara International School & Junior College2.1 km
- CollegeIndira College of Commerce & Science (ICCS)2.2 km
- SchoolIndira National School2.4 km
- TempleShani Mandir2.6 km
- CollegeSri Balaji University, Pune (SBUP)2.9 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
Amenities
- CCTV installed in common areas.
Last checked 22 Nov 2026.
MahaRERA record
From MahaRERA, read 20 Nov 2026Possession date
28 Apr 2029
The completion date filed with MahaRERA is 28 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 28 Dec 2028.
Beside other Tathawade projects
Worked out by Avasetu- Homes booked
- 59%
- The middle of 74 Tathawade projects registered within a year of it: 53%.
- Completion date
- Not moved by the builder
- 53 of 233 Tathawade projects being built moved theirs 3 months or more.
From MahaRERA records read 20 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 298 of 504
- Towers
- 5 in this registration
- The tallest has 28 floors.
- Units
- 504
- 500 homes, 4 shops or offices.
- Registered on
- 8 Sep 2023
- MahaRERA registration
- P52100052534
- Listed or updated on MahaRERA 30 Sep 2025.
- Promoter (builder)
- Gd Square Spaces
- Project type
- Others
- Pincode
- 411033
Tower by tower
5 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| WING-A | 28 | 104 | 0 |
| WING-B | 16 | 110 | 0 |
| WING-C | 16 | 110 | 0 |
| WING-D | 16 | 110 | 0 |
| WING-E | 11 | 66 | 4 |
As filed with MahaRERA (sanctioned floors).
Gd Square Spaces: track record
From MahaRERA recordsGd Square Spaces has 1 project in our MahaRERA register for Pune.
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Tathawade
- 12th Avenuepossession Apr 2029
- 24Life Altaapossession Feb 2029
- 33 Central Avenue2, 3 BHK · from ₹87.3 L · possession Apr 2029Starts ₹19 L higher than 18 Magnitude
- AA Privilege2, 3 BHK · from ₹69 L · possession Apr 2029About the same starting price as 18 Magnitude
- Akshay Residencypossession Dec 2029
- Aster Parkpossession Apr 2029
FAQ
What is the price of 18 Magnitude?
Homes from ₹67.95 L to ₹1.35 Cr, checked on 22 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of 18 Magnitude?
The completion date filed with MahaRERA is 28 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of 18 Magnitude?
18 Magnitude is registered with MahaRERA as P52100052534.
How many towers and floors does 18 Magnitude have?
MahaRERA lists 5 buildings, the tallest with 28 floors.
How many flats are there in 18 Magnitude?
MahaRERA lists 504 units (500 residential, 4 other).
How many homes in 18 Magnitude are booked?
298 of 504 homes were booked as per MahaRERA on 20 Nov 2026.
Who is the builder of 18 Magnitude?
The promoter registered with MahaRERA is Gd Square Spaces.
Where is 18 Magnitude?
18 Magnitude is in 411033, Mulshi, Pune district (pincode 411033).
Which school is nearest to 18 Magnitude?
Akshara International School & Junior College, about 2.1 km away in a straight line from the map position; the drive is longer.
How far is 18 Magnitude from Pune Airport?
About 19.2 km in a straight line from the map position; the drive is longer.
How far is 18 Magnitude from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?
About 3.7 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to 18 Magnitude.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 30 Sep 2025
- Dates and homes bookedFrom MahaRERA
Checked 22 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 10 Nov 2026
- Location and nearbyGathered and checked
Checked 22 Nov 2026
- DescriptionGathered and checked
Checked 22 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (22 Nov 2026)
- Project facts and amenitiesGathered and checked
The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (22 Nov 2026)
Get the price sheet and floor plans for 18 Magnitude
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.