Kolte Patil 24K Manor from space, 2022 to 2026
The site starts as green land and shows active ground clearing and building footprint development following the July 2023 and subsequent RERA registrations, with tall building shadows emerging in later seasons.
14 seasons, Jan 2022 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Tall building shadows visible in the ring. Little change.
- Apr–May 2026Clear structures and ground work visible inside the ring.
- Jan–Mar 2026Building shadows and footprints remain visible in the ring.
- Oct–Dec 2025Tall building shadows fall northwest, indicating ongoing structural work.
- Apr–May 2025Bright structures and clearing visible near the ring.
- Jan–Mar 2025New building footprints and shadows visible after recent registrations.
- Oct–Dec 2024Dark shadows of tall buildings appear, showing vertical growth.
- Apr–May 2024Bright structures and cleared ground inside the ring.
- Jan–Mar 2024Ground cleared and new foundations visible after registrations.
- Oct–Dec 2023Work shows after the Jul 2023 registration with ground clearing.
- Apr–May 2023Dry ground visible inside the ring. Little change from before.
- Jan–Mar 2023Plant cover remains in the ring. Little change from before.
- Oct–Dec 2022Monsoon green covers the ring area. Little change from before.
- Jan–Mar 2022Plants and trees cover the ring. Little change from before.
Kolte Patil 24K Manor: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.