Skip to main contentSkip to navigation

41 Zillenia from space, 2022 to 2026

The site starts as bare ground with neighbouring buildings outside the ring. Following the July 2023 RERA registration, sheds and building footprints appear inside the ring, with shadows indicating tall structures developing by early 2025.

Today, from Google satellite, centred on the same map pin.

15 seasons, Jan 2022 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Jan–Mar 2025Dark shadows of tall buildings cast northwest inside the ring.
  2. Jan–Mar 2024Building footprint taking shape inside the ring.
  3. Oct–Dec 2023Work shows after the Jul 2023 registration with new building foundations.
  4. Apr–May 2023Blue sheets and sheds appear in the ring.

41 Zillenia: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.