Namrata 6 Boulevard from space, 2024 to 2026
Registered with MahaRERA in Apr 2026. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.
9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Surrounding vegetation grows around the new structures.
- Apr–May 2026Little change in structure brightness.
- Jan–Mar 2026Bright building footprints visible after April 2026 registration.
- Oct–Dec 2025New bright structures appear inside the ring.
- Apr–May 2025Dry earth and cleared plots visible.
- Jan–Mar 2025Ground clearance visible with reduced plant cover.
- Oct–Dec 2024Green patches and earth visible near the road.
- Apr–May 2024Dry soil and sparse vegetation present.
- Jan–Mar 2024Vegetation remains visible with a horizontal road structure below.
Namrata 6 Boulevard: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.