Abhimaan Homes Phase 3 from space, 2021 to 2026

Abhimaan Homes Phase 3 shows ground clearing prior to its January 2022 registration, followed by the appearance of new building footprints and casting shadows inside the ring corresponding to registered construction activity.

Today, from Google satellite, centred on the same map pin.

18 seasons, Jan 2021 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2024Structures cast distinct shadows in ring.
  2. Jan–Mar 2024Building footprints expand further.
  3. Jan–Mar 2023Shadows indicate growing structures inside ring.
  4. Oct–Dec 2022New building footprint emerges within ring.
  5. Jan–Mar 2022Work begins inside ring following registration.
  6. Jan–Mar 2021Ground cleared near ring, neighboring structure visible south.

Abhimaan Homes Phase 3: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.