Ace Ayodhya in Thergaon from space, 2024 to 2026
Registered with MahaRERA in May 2026. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.
9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Construction activity continues with visible structure footprints and casting shadows nearby.
- Apr–May 2026Bright new building footprints and active construction features emerge within the ring.
- Jan–Mar 2026Work shows after the May 2026 registration as bright structural foundations appear.
- Oct–Dec 2025Patches of green vegetation cover parts of the open plot inside.
- Apr–May 2025Unbuilt soil and sparse vegetation are visible in the ring with little change.
- Jan–Mar 2025Ground is cleared again with very little plant cover remaining inside.
- Oct–Dec 2024Seasonal greenery reappears on the open plot inside the yellow ring.
- Apr–May 2024Dry conditions persist with minimal plant cover inside the ring area.
- Jan–Mar 2024Vegetation recedes, leaving bare ground and soil visible within the ring.
Ace Ayodhya in Thergaon: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.