Skip to main contentSkip to navigation

Ace Ayodhya in Thergaon from space, 2024 to 2026

Registered with MahaRERA in May 2026. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

Today, from Google satellite, centred on the same map pin.

9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Construction activity continues with visible structure footprints and casting shadows nearby.
  2. Apr–May 2026Bright new building footprints and active construction features emerge within the ring.
  3. Jan–Mar 2026Work shows after the May 2026 registration as bright structural foundations appear.
  4. Oct–Dec 2025Patches of green vegetation cover parts of the open plot inside.
  5. Apr–May 2025Unbuilt soil and sparse vegetation are visible in the ring with little change.
  6. Jan–Mar 2025Ground is cleared again with very little plant cover remaining inside.
  7. Oct–Dec 2024Seasonal greenery reappears on the open plot inside the yellow ring.
  8. Apr–May 2024Dry conditions persist with minimal plant cover inside the ring area.
  9. Jan–Mar 2024Vegetation recedes, leaving bare ground and soil visible within the ring.

Ace Ayodhya in Thergaon: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.