Anp Ultimus, Hinjawadi

See the site from above today

by Swadik Trade Private Limited · Hinjawadi, Mulshi, Pune district · 411057

Homes
2, 2.5 BHK
Price
from ₹1.1 Cr
EMI about ₹76,368 a month
Possession
Oct 2027
completion filed with MahaRERA
Booked
720 of 840

As of 15 Nov 2026, Anp Ultimus by Swadik Trade Private Limited in Hinjawadi, Pune district is registered with MahaRERA as P52100047835. The completion date filed with MahaRERA is 30 Oct 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). MahaRERA shows 720 of 840 homes booked. That is 86% booked, against 74% for the middle of 48 Hinjawadi projects registered within a year of it. 2, 2.5 BHK from ₹1.1 Cr, checked on 23 Nov 2026.

Updated 21 Nov 2026

Our team is still collecting details on Anp Ultimus.

We do not have the builder's pictures and floor plans yet. What you see here is what we have now: MahaRERA's record, read on the date shown. Ask us and we send you what we find first.

Ask for the detailsOther new projects we are reading

Price

  • 2 BHK

    From ₹1.1 Cr

    Last checked 23 Nov 2026

    All-in cost of the 2 BHK at ₹1.1 Cr: about ₹1.24 Cr
    Price (agreement value)₹1.1 Cr
    GST (5%)₹5.5 L
    Stamp duty (7%)₹7.7 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.24 Cr
  • 2.5 BHK

    From ₹1.25 Cr

    Last checked 23 Nov 2026

    All-in cost of the 2.5 BHK at ₹1.25 Cr: about ₹1.4 Cr
    Price (agreement value)₹1.25 Cr
    GST (5%)₹6.25 L
    Stamp duty (7%)₹8.75 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.4 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹76,368 a monthOn a ₹88 L loan (80% of ₹1.1 Cr) at 8.5% for 20 years. Ask your bank for its rate.

Rough price guide for Anp Ultimus

  • 3 BHK about ₹1.5 – 1.7 Cr
  • 3.5 BHK about ₹1.6 – 1.9 Cr

Our own rounded guide, checked against the area on 23 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.

What new homes in Hinjawadi usually ask

  • 1 BHK about ₹70 – 85 L (4 projects)
  • 2 BHK about ₹75 L – ₹1.1 Cr (44 projects)
  • 2.5 BHK about ₹80 L – ₹1.3 Cr (3 projects)
  • 3 BHK about ₹1 – 1.6 Cr (43 projects)
  • 3.5 BHK about ₹1.7 – 2.1 Cr (5 projects)
  • 4 BHK about ₹1.9 – 2.7 Cr (14 projects)
  • 4.5 BHK about ₹1.8 – 2.2 Cr (5 projects)
  • 5 BHK about ₹2.1 – 2.7 Cr (4 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Hinjawadi, rounded. Use it to judge an offer, not as a price.

Hinjawadi average ₹11,462/sq ft across 21 projectsThe middle asking price per sq ft of other projects in Hinjawadi.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Anp Ultimus from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Anp Ultimus, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024 and Oct 2025, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Anp Ultimus from above, satellite picture of Nov 2022
    Nov 2022
  2. Anp Ultimus from above, satellite picture of Jan 2024
    Jan 2024
  3. Anp Ultimus from above, satellite picture of Oct 2025
    Oct 2025 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Jan–Mar 2026 (looked Nov 2026)

Tall structure shadows fall across the area.

Registered with MahaRERA Nov 2022 · possession filed for Oct 2027

Season by season, Jan 2021 to Oct 2026: 18 seasons, October to May (the monsoon is under cloud).

ANP Ultimus shows ground preparation and subsequent construction activity following its November 2022 registration, with tall structures casting prominent shadows in later years.

The seasons before

  1. Jan–Mar 2023Ground clearing and early structure work inside the ring.
  2. Oct–Dec 2022Work shows after the Nov 2022 registration.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)1.9 km
  • Baner-Balewadi High Street3.2 km
  • Pune Railway Station14.4 km
  • Pune Airport (Lohegaon)16.2 km

Nearby

  • Bus standWakad Chowk0.6 km
  • ShoppingPhoenix Mall of the Millennium0.7 km
  • TempleShani Mandir1.8 km
  • SchoolAkshara International School & Junior College2.1 km
  • CollegeIndira College of Commerce & Science (ICCS)2.2 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

MahaRERA record

From MahaRERA, read 15 Nov 2026

Possession date

30 Oct 2027

The completion date filed with MahaRERA is 30 Oct 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Jun 2027.

Beside other Hinjawadi projects

Worked out by Avasetu
Homes booked
86%
The middle of 48 Hinjawadi projects registered within a year of it: 74%.
Completion date
Not moved by the builder
47 of 150 Hinjawadi projects being built moved theirs 3 months or more.

From MahaRERA records read 15 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
720 of 840
Towers
6 in this registration
The tallest has 38 floors.
Registered on
28 Nov 2022
MahaRERA registration
P52100047835
Listed or updated on MahaRERA 28 Nov 2022.
Promoter (builder)
Swadik Trade Private Limited
Project type
Residential / Group Housing
Pincode
411057

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Towers go up to 38 floors. Ask how many lifts serve your tower and how many homes share them.

Tower by tower

6 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
A - Building381400
B - Building381400
C - Building381400
D - Building381400
E - Building381400
F - Building381400

As filed with MahaRERA (sanctioned floors).

Swadik Trade Private Limited: track record

From MahaRERA records

Swadik Trade Private Limited has 2 projects in our MahaRERA register for Pune.

All 2 projects by Swadik Trade Private Limited in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Hinjawadi

More by Swadik Trade Private Limited

FAQ

What is the price of Anp Ultimus?

2 BHK: ₹1.1 Cr; 2.5 BHK: ₹1.25 Cr, checked on 23 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Anp Ultimus?

The completion date filed with MahaRERA is 30 Oct 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Anp Ultimus?

Anp Ultimus is registered with MahaRERA as P52100047835.

How many towers and floors does Anp Ultimus have?

MahaRERA lists 6 buildings, the tallest with 38 floors.

How many flats are there in Anp Ultimus?

MahaRERA lists 840 units.

How many homes in Anp Ultimus are booked?

720 of 840 homes were booked as per MahaRERA on 15 Nov 2026.

Who is the builder of Anp Ultimus?

The promoter registered with MahaRERA is Swadik Trade Private Limited. Our register has 2 Pune projects by Swadik Trade Private Limited.

Where is Anp Ultimus?

Anp Ultimus is in Mulshi, Pune district (pincode 411057).

Which school is nearest to Anp Ultimus?

Akshara International School & Junior College, about 2.1 km away in a straight line from the map position; the drive is longer.

How far is Anp Ultimus from Pune Airport?

About 16.2 km in a straight line from the map position; the drive is longer.

How far is Anp Ultimus from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 1.9 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Anp Ultimus.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 28 Nov 2022

  • Dates and homes bookedFrom MahaRERA

    Checked 19 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 19 Nov 2026

  • Location and nearbyGathered and checked

    Checked 19 Nov 2026

  • DescriptionNot checked yet

    Still checking

  • PricesGathered and checked

    The builder's site, or two property sites that agree (23 Nov 2026)

  • Rough price guideGathered and checked

    An asking price seen on one site, rounded and checked against the area (23 Nov 2026)

Get the price sheet and floor plans for ANP ULTIMUS

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment