Aranya from space, 2021 to 2026
The Aranya site in Pune transitioned from bare land and vegetation in 2021 to active ground clearing by late 2022. Following its July 2023 MahaRERA registration, new building footprints and tall structures with distinct shadows emerged steadily through 2026.
43 clear months, Jan 2021 to Nov 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Jan–Mar 2026Structures maintain established heights with clear shadows.
- Jan–Mar 2025Long shadows from vertical structures confirm significant vertical growth.
- Oct–Dec 2024Building footprints become more pronounced with surrounding ground work.
- Jan–Mar 2024Ground cleared
- Oct–Dec 2023Ground cleared
- Apr–May 2023New building footprints and structure outlines appear.
- Jan–Mar 2023Plants being cleared
- Oct–Dec 2022New ground clearing activity visible inside the ring.
- Apr–May 2022Dry conditions with reduced plant cover.
- Jan–Mar 2022Ground remains mostly clear with sparse vegetation.
- Oct–Dec 2021Vegetation increases slightly following monsoon rains.
- Jan–Mar 2021Ground is bare with scattered plants and no buildings inside the ring.
Aranya: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.