Commute from Kondhwa: drive times to Pune Railway Station, Magarpatta Cybercity and Commerzone
Updated 28 Nov 2026 · from Google Maps (Routes API), typical weekday traffic
Driving from the Kondhwa centre on a weekday, Pune Railway Station is 8.9 km by road: 22-40 min at 9 am and 27-52 min back at 6 pm; Magarpatta Cybercity is 10.4 km by road: 25-45 min at 9 am and 31-61 min back at 6 pm; Commerzone, Yerwada is 13.5 km by road: 33-63 min at 9 am and 42-81 min back at 6 pm. Google's typical traffic, measured 28 Nov 2026.
Drive times at 9 am and 6 pm
| To | By road | 9 am | 6 pm, back |
|---|---|---|---|
| Pune Railway Station | 8.9 km | 22-40 min | 27-52 min |
| Magarpatta Cybercity | 10.4 km | 25-45 min | 31-61 min |
| Commerzone, Yerwada | 13.5 km | 33-63 min | 42-81 min |
| Kalyani Nagar offices (Cerebrum IT Park) | 13.8 km | 35-68 min | 41-82 min |
| Pune Airport (Lohegaon) | 22.2 km | 59 min | 58 min |
Driving from the Kondhwa centre on a weekday, Google's typical traffic. Source: Google Maps (Routes API), typical weekday traffic · measured 28 Nov 2026
Roads, metro and rules changing near Kondhwa
- Patal Lok underground road (Bhosari to Undri)Plan reworked: the 23 km Bhosari-Undri tunnel through Khadi Machine Chowk is now the priority, and the civic body approved hiring a consultant for its detailed project report. A project report for an 8 km Bhugaon-Erandwane tunnel was approved, and a Swargate-Shaniwarwada tunnel is being studied.Status of 17 Nov 2026
Projects in Kondhwa
- Babar Classic Vista84 homes booked (15% of its 543 homes) between 2026-10-21 and 2026-11-20
- Chordiya Sanskruti9 homes booked (12% of its 73 homes) between 2026-10-20 and 2026-11-19
- Indraprastha Ayodhya8 homes booked (5% of its 160 homes) between 2026-10-21 and 2026-11-20
- Akshardham Phase 210 homes booked (10% of its 100 homes) between 2026-10-14 and 2026-11-13
- Platinum Towerscompletion filed for 30 Apr 2029
- Aranyacompletion filed for 30 Jun 2028
Being built around it
124 projects with 14,553 homes being built within 2 km, due 2026 to 2034.
- Dwarikadham1,091 homes · due Jun 2028
- Babar Classic Vista1,009 homes · due Jul 2031
- Unitas Fashion Center740 homes · due Dec 2027
From MahaRERA's register. Source: MahaRERA project register (our copy, read daily) · measured 28 Nov 2026
How this is measured
Drive times are Google's typical traffic for a weekday leaving at 9 am, and coming back at 6 pm, from the place centre; a home at the edge of the place can be a few minutes either way. Distances are by road. Measured once a month. Every figure on this page is counted by code from the sources named, never written by a model.