Commute from Peth areas: drive times to Pune Railway Station, Commerzone and Magarpatta Cybercity
Updated 28 Nov 2026 · from Google Maps (Routes API), typical weekday traffic
Driving from the Peth areas centre on a weekday, Pune Railway Station is 4.1 km by road: 12-23 min at 9 am and 20-42 min back at 6 pm; Commerzone, Yerwada is 9.7 km by road: 23-45 min at 9 am and 25-51 min back at 6 pm; Magarpatta Cybercity is 11.2 km by road: 26-51 min at 9 am and 35-68 min back at 6 pm. Google's typical traffic, measured 28 Nov 2026.
Drive times at 9 am and 6 pm
| To | By road | 9 am | 6 pm, back |
|---|---|---|---|
| Pune Railway Station | 4.1 km | 12-23 min | 20-42 min |
| Commerzone, Yerwada | 9.7 km | 23-45 min | 25-51 min |
| Magarpatta Cybercity | 11.2 km | 26-51 min | 35-68 min |
| Kalyani Nagar offices (Cerebrum IT Park) | 10.3 km | 27-57 min | 35-74 min |
| Pune Airport (Lohegaon) | 19.7 km | 51 min | 47 min |
Driving from the Peth areas centre on a weekday, Google's typical traffic. Source: Google Maps (Routes API), typical weekday traffic · measured 28 Nov 2026
Roads, metro and rules changing near Peth areas
- Pune Metro phase 2 (four new corridors)Tenders have begun: Maha Metro invited bids for the 6.5 km SNDT-Warje stretch, with two flyovers planned at Karve Putala Chowk and Ambedkar Chowk. The Ramwadi-Wagholi stretch is likely to be built as a double-decker.Status of 27 Nov 2026
- Patal Lok underground road (Bhosari to Undri)Plan reworked: the 23 km Bhosari-Undri tunnel through Khadi Machine Chowk is now the priority, and the civic body approved hiring a consultant for its detailed project report. A project report for an 8 km Bhugaon-Erandwane tunnel was approved, and a Swargate-Shaniwarwada tunnel is being studied.Status of 17 Nov 2026
- Swargate-Katraj metro extensionConstruction: the first tunnel boring machine has arrived and tunnelling is to begin in January. The two machines that will tunnel towards Katraj are expected in six to eight months, and the corporation is handing over land for the Padmavati station.Status of 6 Nov 2026
Projects in Peth areas
- Centralvista11 homes booked (4% of its 300 homes) between 2026-10-13 and 2026-11-12
- Srushticompletion filed for 31 Mar 2030
- Dattaprasad Preranacompletion filed for 31 Dec 2029
- Hibiscuscompletion filed for 1 Dec 2028
- Prasannamcompletion filed for 31 Dec 2028
- Shashankcompletion filed for 30 Dec 2030
Being built around it
138 projects with 6,082 homes being built within 2 km, due 2026 to 2033.
- Nyati Evania300 homes · due Aug 2030
- Wyng286 homes · due Apr 2030
- Sara Kasturi Building C264 homes · due Apr 2033
From MahaRERA's register. Source: MahaRERA project register (our copy, read daily) · measured 28 Nov 2026
How this is measured
Drive times are Google's typical traffic for a weekday leaving at 9 am, and coming back at 6 pm, from the place centre; a home at the edge of the place can be a few minutes either way. Distances are by road. Measured once a month. Every figure on this page is counted by code from the sources named, never written by a model.