Commute from Pirangut: drive times to Baner-Balewadi offices, Hinjawadi Phase 3 and Hinjawadi Phase 1
Updated 28 Nov 2026 · from Google Maps (Routes API), typical weekday traffic
Driving from the Pirangut centre on a weekday, Baner-Balewadi offices (Balewadi High Street) is 17.1 km by road: 33-53 min at 9 am and 40-63 min back at 6 pm; Hinjawadi Phase 3 (Rajiv Gandhi Infotech Park) is 17.4 km by road: 34-49 min at 9 am and 38-58 min back at 6 pm; Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park) is 17.9 km by road: 35-50 min at 9 am and 40-59 min back at 6 pm. Google's typical traffic, measured 28 Nov 2026.
Drive times at 9 am and 6 pm
| To | By road | 9 am | 6 pm, back |
|---|---|---|---|
| Baner-Balewadi offices (Balewadi High Street) | 17.1 km | 33-53 min | 40-63 min |
| Hinjawadi Phase 3 (Rajiv Gandhi Infotech Park) | 17.4 km | 34-49 min | 38-58 min |
| Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park) | 17.9 km | 35-50 min | 40-59 min |
| Hinjawadi Phase 2 (Rajiv Gandhi Infotech Park) | 19.8 km | 37-55 min | 40-63 min |
| Pune Airport (Lohegaon) | 35.3 km | 77-122 min | 85-137 min |
Driving from the Pirangut centre on a weekday, Google's typical traffic. Source: Google Maps (Routes API), typical weekday traffic · measured 28 Nov 2026
Roads, metro and rules changing near Pirangut
- Patal Lok underground road (Bhosari to Undri)Plan reworked: the 23 km Bhosari-Undri tunnel through Khadi Machine Chowk is now the priority, and the civic body approved hiring a consultant for its detailed project report. A project report for an 8 km Bhugaon-Erandwane tunnel was approved, and a Swargate-Shaniwarwada tunnel is being studied.Status of 17 Nov 2026
Projects in Pirangut
- Park Pebbles Phase I65 homes booked (9% of its 691 homes) between 2026-10-21 and 2026-11-28
- The Winds by Kolte Patil49 homes booked (12% of its 407 homes) between 2026-10-20 and 2026-11-19
- Rohan Saroha28 homes booked (9% of its 306 homes) between 2026-10-20 and 2026-11-19
- K Raheja The Glades, Viva, Pirangut13 homes booked (7% of its 175 homes) between 2026-10-13 and 2026-11-12
- Godrej Elanorcompletion filed for 30 Sep 2032
- Mahindra Rivenzacompletion filed for 30 Dec 2031
Being built around it
110 projects with 16,560 homes being built within 2 km, due 2026 to 2033.
- Godrej Elanor1,345 homes · due Sep 2032
- Mahindra Rivenza1,236 homes · due Dec 2031
- Avian Valley - Solaire781 homes · due Apr 2030
From MahaRERA's register. Source: MahaRERA project register (our copy, read daily) · measured 28 Nov 2026
How this is measured
Drive times are Google's typical traffic for a weekday leaving at 9 am, and coming back at 6 pm, from the place centre; a home at the edge of the place can be a few minutes either way. Distances are by road. Measured once a month. Every figure on this page is counted by code from the sources named, never written by a model.