Astrana, Hadapsar
See the site from above todayHadapsar, Haveli, Pune district · 411028
- Price
- from ₹1.03 Cr
- EMI about ₹71,509 a month
- Possession
- Jul 2028
- completion filed with MahaRERA
- Booked
- 248 of 567
What stands out
As of 19 Nov 2026, from MahaRERA and the sources below.
- This registration contains 567 homes across 5 buildings, which is more than any of the other 69 projects still being built in Hadapsar.
- 44% of homes booked: Buyers have booked 248 of the 567 homes, while similar projects in the area are at about 50% booked.
- MahaRERA's order added 4 months to most projects' dates, which is the whole difference between the registration date and the filing date.
- Part of a bigger project: This registration is part of a bigger project, so buyers should check which part they are purchasing.
Updated 21 Nov 2026
Price
Homes
₹1.03 Cr – ₹2.89 Cr
Last checked 20 Nov 2026
All-in cost of a home at ₹1.03 Cr: about ₹1.16 Cr
Price (agreement value) ₹1.03 Cr GST (5%) ₹5.15 L Stamp duty (7%) ₹7.21 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹1.16 Cr
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹71,509 a monthOn a ₹82.4 L loan (80% of ₹1.03 Cr) at 8.5% for 20 years. Ask your bank for its rate.
What new homes in Hadapsar usually ask
- 2 BHK about ₹60 L – ₹1.2 Cr (12 projects)
- 3 BHK about ₹1.2 – 1.6 Cr (8 projects)
- 4 BHK about ₹1.7 – 3.25 Cr (3 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Hadapsar, rounded. Use it to judge an offer, not as a price.
Get the exact price for your home
The Avasetu team gets you the current price sheet for the size you want, with parking and all other charges.
Astrana from above, today
Astrana, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Mar 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.
Nov 2022 Jan 2024 Mar 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Oct–Dec 2026 (looked Nov 2026)
Final phases of tall structures cast deep shadows across the site.
Registered with MahaRERA Apr 2024 · possession filed for Jul 2028
Astrana shows green land evolving into active construction footprints and tall building shadows following its April 2024 MahaRERA registration.
The seasons before
- Apr–May 2026Active construction footprints and shadows remain prominent within the ring.
- Jan–Mar 2026Dense tall structures cast prominent shadows toward the northwest.
- Oct–Dec 2025Multiple tall buildings cast extended shadows across the site.
Construction proof from space: Jan 2023 to Oct 2026, Copernicus Sentinel-2 (8 earlier seasons)
- Apr–May 2025Construction continues with prominent structural shadows visible in the ring.
- Jan–Mar 2025Tall building footprints and shadows expand further inside the ring.
- Oct–Dec 2024Dark shadows from tall structures cast northwest across the ring.
- Apr–May 2024New building foundations and structures take shape after April 2024 registration.
- Jan–Mar 2024Plants being cleared
- Oct–Dec 2023Earthwork and foundation activities appear inside the ring area.
- Apr–May 2023Bare soil and disturbed ground visible across the ring area.
- Jan–Mar 2023Ground clearing begins inside the ring with reduced plant cover.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- Magarpatta City1.4 km
- World Trade Center, Kharadi4.8 km
- EON IT Park, Kharadi4.9 km
- Pune Railway Station7.2 km
Nearby
- Bus standHadapsar Gadital1.1 km
- ShoppingAmanora Mall1.1 km
- BankPunjab National Bank1.2 km
- ShoppingSeasons Mall1.3 km
- Railway stationHadapsar2.3 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
Project facts
- The project is built on a land parcel measuring 6.5 acres.
- The project offers 2, 3, 3 BHK Duplex, and 4 BHK homes.
Last checked 20 Nov 2026.
MahaRERA record
From MahaRERA, read 19 Nov 2026Possession date
31 Jul 2028
The completion date filed with MahaRERA is 31 Jul 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Mar 2028.
Beside other Hadapsar projects
Worked out by Avasetu- Homes booked
- 44%
- The middle of 19 Hadapsar projects registered within a year of it: 50%.
- Completion date
- Not moved by the builder
- 17 of 77 Hadapsar projects being built moved theirs 3 months or more.
From MahaRERA records read 19 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 248 of 567
- Towers
- 5 in this registration
- The tallest has 37 floors. 6 in the whole project.
- Registered on
- 5 Apr 2024
- MahaRERA registration
- P52100055666
- Listed or updated on MahaRERA 23 Sep 2026.
- Project type
- Residential / Group Housing
- Pincode
- 411028
Check before you book
From MahaRERA- Towers go up to 37 floors. Ask how many lifts serve your tower and how many homes share them.
Tower by tower
5 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| AURIGA A - TOWER A | 37 | 114 | 0 |
| AURIGA B - TOWER B | 37 | 114 | 0 |
| ATRIA - TOWER E | 35 | 111 | 0 |
| AURIGA C - TOWER C | 37 | 114 | 0 |
| AURIGA D - TOWER D | 37 | 114 | 0 |
As filed with MahaRERA (sanctioned floors).
What the builder's and property sites say
Gathered and checked- Floors per tower (highest)
- up to 30 floors
- Land
- 6.5 acres
Last checked 20 Nov 2026. MahaRERA counts where they differ.
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Hadapsar
FAQ
What is the price of Astrana?
Homes from ₹1.03 Cr to ₹2.89 Cr, checked on 20 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of Astrana?
The completion date filed with MahaRERA is 31 Jul 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of Astrana?
Astrana is registered with MahaRERA as P52100055666.
How many towers and floors does Astrana have?
MahaRERA lists 5 buildings, the tallest with 37 floors.
How many flats are there in Astrana?
MahaRERA lists 567 units.
How many homes in Astrana are booked?
248 of 567 homes were booked as per MahaRERA on 19 Nov 2026.
Where is Astrana?
Astrana is in 411028, Haveli, Pune district (pincode 411028).
Which railway station is nearest to Astrana?
Hadapsar, about 2.3 km away in a straight line from the map position; the drive is longer.
How far is Astrana from Magarpatta City?
About 1.4 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Astrana.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 23 Sep 2026
- Dates and homes bookedFrom MahaRERA
Checked 20 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 9 Nov 2026
- Location and nearbyGathered and checked
Checked 20 Nov 2026
- DescriptionGathered and checked
Checked 20 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (20 Nov 2026)
- Project facts and amenitiesGathered and checked
The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (20 Nov 2026)