Skip to main contentSkip to navigation

Balaji Dham Phase-1 from space, 2021 to 2026

From the first picture to the last, the ground inside and near the ring remains largely unchanged with minimal variation in terrain and vegetation.

Today, from Google satellite, centred on the same map pin.

17 seasons, Jan 2021 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Jan–Mar 2021Ground shows sparse vegetation and terrain features around the pin.

Balaji Dham Phase-1: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.