
Bg Aspiro, Ravet
See the site from above todayby BG Spaces LLP · Ravet, Haveli, Pune district · 412101
- Homes
- 2, 2.5 BHK
- Price
- from ₹73 L
- EMI about ₹50,681 a month
- Possession
- Oct 2029
- completion filed with MahaRERA
- Booked
- 194 of 364
What stands out
As of 20 Nov 2026, from MahaRERA and the sources below.
- The project originally registered a completion date of 31 Mar 2025. The latest completion date filed with MahaRERA is 30 Oct 2029.
- With 364 homes in this registration, the project has more units than 179 of 199 ongoing developments in Ravet.
- Buyers have booked 194 of 364 homes. While this project sits at 53% booked, similar projects are at about 65%.
Updated 21 Nov 2026
Price
2 BHK
₹73 L – ₹78 L
from 705 sq ft · ₹10,355/sq ft
Last checked 5 Nov 2026
All-in cost of the 2 BHK at ₹73 L: about ₹82.06 L
Price (agreement value) ₹73 L GST (5%) ₹3.65 L Stamp duty (7%) ₹5.11 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹82.06 L 2.5 BHK
₹87 L – ₹90 L
from 868 sq ft · ₹10,023/sq ft
Last checked 5 Nov 2026
All-in cost of the 2.5 BHK at ₹87 L: about ₹97.74 L
Price (agreement value) ₹87 L GST (5%) ₹4.35 L Stamp duty (7%) ₹6.09 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹97.74 L
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹50,681 a monthOn a ₹58.4 L loan (80% of ₹73 L) at 8.5% for 20 years. Ask your bank for its rate.
Rough price guide for Bg Aspiro
- 3 BHK about ₹90 L – ₹1.3 Cr
- 4 BHK about ₹1.4 – 1.6 Cr
Our own rounded guide, checked against the area on 5 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.
What new homes in Ravet usually ask
- 2 BHK about ₹60 – 85 L (46 projects)
- 3 BHK about ₹85 L – ₹1.2 Cr (50 projects)
- 4 BHK about ₹1.7 – 2 Cr (7 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Ravet, rounded. Use it to judge an offer, not as a price.
Ravet average ₹9,809/sq ft across 29 projectsThe middle asking price per sq ft of other projects in Ravet.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
Bg Aspiro from above, today
Bg Aspiro, year by year, up close
Sharp satellite pictures taken in Jan 2022, Nov 2022, Jan 2024 and Feb 2025, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.
Jan 2022 Nov 2022 Jan 2024 Feb 2025 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Oct–Dec 2026 (looked Nov 2026)
Site shows built structures with established access roads.
Registered with MahaRERA Feb 2022 · possession filed for Oct 2029
BG ASPIRO in Pune, registered in February 2022, shows a transition from vacant vegetated land to active construction sites with multi-wing building footprints and casting shadows indicative of tall structures over the observed years.
The seasons before
- Apr–May 2026Little change, site finishing and surrounding roads active.
- Jan–Mar 2026Ground cleared
- Oct–Dec 2025Structures continue developing within the ring.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2 (14 earlier seasons)
- Apr–May 2025Little change, heavy machinery and structures visible.
- Jan–Mar 2025Building heights increase, casting longer winter shadows.
- Oct–Dec 2024Ground cleared
- Apr–May 2024Little change, continuing site activity.
- Jan–Mar 2024Ground preparation and early structure outlines.
- Oct–Dec 2023Initial building foundations appear inside the ring.
- Apr–May 2023Little change, dry ground and minor structural footprints.
- Jan–Mar 2023Clearing continues with earthwork visible in the ring.
- Oct–Dec 2022Work shows after the Feb 2022 registration with ground clearing.
- Apr–May 2022Little change, dry soil visible.
- Jan–Mar 2022Ground remains mostly bare before registration.
- Oct–Dec 2021Green vegetation covers parts of the ring.
- Apr–May 2021Little change, dry ground visible.
- Jan–Mar 2021Ring shows vacant land and vegetation.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)7.7 km
- Baner-Balewadi High Street10.2 km
- Pune Airport (Lohegaon)18.6 km
- Pune Railway Station19.3 km
Nearby
- TempleISKCON (Shree Govinda Dham) Ravet0.6 km
- SchoolS.B. Patil Public School (SBPPS) Ravet, Pune1 km
- CollegePimpri Chinchwad College Of Engineering (PCCOE)1.2 km
- SchoolJnana Prabodhini Navanagar Vidyalaya (JPNV)1.4 km
- ShoppingD Mart Ravet1.4 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
MahaRERA record
From MahaRERA, read 20 Nov 2026Possession date
30 Oct 2029
Completion date filed with MahaRERA. At registration: 31 Mar 2025. Moved 51 months later, 4 of them by MahaRERA's August 2026 order for most projects.
Ask for the possession date in writing in your agreement for sale.
Beside other Ravet projects
Worked out by Avasetu- Homes booked
- 53%
- The middle of 30 Ravet projects registered within a year of it: 65%.
- Completion date
- Moved 51 months later
- 55 of 205 Ravet projects being built moved theirs 3 months or more.
From MahaRERA records read 20 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 194 of 364
- Towers
- 4 in this registration
- The tallest has 18 floors.
- Units
- 364
- 355 homes, 9 shops or offices.
- Registered on
- 22 Feb 2022
- MahaRERA registration
- P52100033558
- Listed or updated on MahaRERA 8 Dec 2025.
- Promoter (builder)
- BG Spaces LLP
- Project type
- Residential / Group Housing
- Pincode
- 412101
Check before you book
From MahaRERA- The builder has moved the completion date 51 months later since registration, from Mar 2025 to Oct 2029 (MahaRERA's 2026 blanket extension for all projects left out). Ask why, and which date goes in your agreement for sale.
Tower by tower
4 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| A Wing | 18 | 94 | 0 |
| B Wing | 18 | 103 | 0 |
| C Wing | 18 | 64 | 0 |
| D Wing | 4 | 94 | 9 |
As filed with MahaRERA (sanctioned floors).
BG Spaces LLP: track record
From MahaRERA recordsBG Spaces LLP has 1 project in our MahaRERA register for Pune.
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Ravet
- Ace Atmosphere Phase Ifrom ₹70.59 L · possession Jan 2029About the same starting price as Bg Aspiro
- Anand Anantapossession Jun 2029
- Arkaa Galaxypossession Apr 2029
- Arohi Skylinepossession Dec 2029
- Ace Asterpossession Jul 2029
- Aditya Vivaaz2, 3 BHK · from ₹84 L · possession Apr 2029Starts ₹11 L higher than Bg Aspiro
FAQ
What is the price of Bg Aspiro?
2 BHK: ₹73 L to ₹78 L; 2.5 BHK: ₹87 L to ₹90 L, checked on 5 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of Bg Aspiro?
The completion date filed with MahaRERA is 30 Oct 2029. At registration it was 31 Mar 2025. MahaRERA added 4 months to most projects' dates in August 2026 (Order 66/2026). Ask the builder for the possession date in your agreement, in writing.
What is the MahaRERA number of Bg Aspiro?
Bg Aspiro is registered with MahaRERA as P52100033558.
How many towers and floors does Bg Aspiro have?
MahaRERA lists 4 buildings, the tallest with 18 floors.
How many flats are there in Bg Aspiro?
MahaRERA lists 364 units (355 residential, 9 other).
How many homes in Bg Aspiro are booked?
194 of 364 homes were booked as per MahaRERA on 20 Nov 2026.
Who is the builder of Bg Aspiro?
The promoter registered with MahaRERA is BG Spaces LLP.
Where is Bg Aspiro?
Bg Aspiro is in Haveli, Pune district (pincode 412101).
Which school is nearest to Bg Aspiro?
S.B. Patil Public School (SBPPS) Ravet, Pune, about 1 km away in a straight line from the map position; the drive is longer.
How far is Bg Aspiro from Pune Airport?
About 18.6 km in a straight line from the map position; the drive is longer.
How far is Bg Aspiro from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?
About 7.7 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Bg Aspiro.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 8 Dec 2025
- Dates and homes bookedFrom MahaRERA
Checked 5 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 5 Nov 2026
- Location and nearbyGathered and checked
Checked 5 Nov 2026
- DescriptionGathered and checked
Checked 5 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (5 Nov 2026)
- Rough price guideGathered and checked
An asking price seen on one site, rounded and checked against the area (5 Nov 2026)
Get the price sheet and floor plans for BG ASPIRO
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.