Skip to main contentSkip to navigation
Birla Punya residences showcasing timeless architecture in PuneBirla Estates logo
The builder's picture
MahaRERA registered P52100079533Verify on MahaRERA (opens in a new tab)

Birla Punya, Camp

Filed on MahaRERA as Birla Punya Phase 1

See the site from above today

by Birla Estates · Camp, Pune City, Pune district · 411001

Homes
1, 2 BHK
Price
from ₹99 L
EMI about ₹68,732 a month
Possession
from Jan 2032
its parts filed Jan 2032 to Oct 2032
Booked
341 of 578
156 booked in the last 30 days

What stands out

As of 12 Nov 2026, from MahaRERA and the sources below.

  • Completion date 30 Jan 2032: The builder originally filed for a completion date of 30 Sep 2031. A MahaRERA order added 4 months to the timeline for most projects in August 2026, which accounts for the entire difference in the current date.
  • 79% open space: The project is planned with 4 towers on 5 acres of land, leaving a large portion of the site as open space. It has also received IGBC Gold Pre-certification for its green features like solar and rainwater harvesting.
  • The 4 towers in this part of the project reach heights of 25 floors. The apartments range from 485 square foot 1 BHK units to 4.5 BHK units reaching 2082 square feet.

Updated 21 Nov 2026

Pictures

Birla Punya riverside residences in Central Pune
Birla Punya family residences surrounded by landscaped greenery in Pune
Birla Punya exclusive clubhouse surrounded by landscaped greenery
Birla Punya balcony with expansive green views in Pune
Landscaped park and walking trails at Birla Punya Pune
Birla Punya urban terraces with landscaped residential spaces in Pune
Luxury living and dining room interior at Birla Punya Pune

From the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Price

  • 1 BHK

    From ₹99 L

    Last checked 5 Nov 2026

    All-in cost of the 1 BHK at ₹99 L: about ₹1.11 Cr
    Price (agreement value)₹99 L
    GST (5%)₹4.95 L
    Stamp duty (7%)₹6.93 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.11 Cr
  • 2 BHK

    From ₹1.86 Cr

    As listed on the builder's site, 5 Nov 2026

    All-in cost of the 2 BHK at ₹1.86 Cr: about ₹2.09 Cr
    Price (agreement value)₹1.86 Cr
    GST (5%)₹9.3 L
    Stamp duty (7%)₹13.02 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹2.09 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹68,732 a monthOn a ₹79.2 L loan (80% of ₹99 L) at 8.5% for 20 years. Ask your bank for its rate.

Rough price guide for Birla Punya

  • 3 BHK about ₹3.25 – 3.75 Cr
  • 4.5 BHK about ₹4.25 – 5 Cr

Our own rounded guide, checked against the area on 5 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Birla Punya from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Birla Punya, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Mar 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Birla Punya from above, satellite picture of Nov 2022
    Nov 2022
  2. Birla Punya from above, satellite picture of Jan 2024
    Jan 2024
  3. Birla Punya from above, satellite picture of Mar 2025
    Mar 2025
  4. Birla Punya from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Little change visible in the ring area.

Registered with MahaRERA Mar 2025 · possession filed for from Jan 2032

Season by season, Jan 2024 to Oct 2026: 9 seasons, October to May (the monsoon is under cloud).

Satellite imagery shows initial ground clearing and preparatory activity appearing near the pin following the 2025 MahaRERA registrations, transitioning from earlier vegetated and built structures.

The seasons before

  1. Apr–May 2026Dry conditions with persistent cleared ground.
  2. Jan–Mar 2026Little change, ground remains cleared near the pin.
  3. Oct–Dec 2025Work continues following recent registrations, ground active.
Construction proof from space: Jan 2024 to Oct 2026, Copernicus Sentinel-2 (5 earlier seasons)
  1. Apr–May 2025Little change, bare ground persists around the ring.
  2. Jan–Mar 2025Work shows after the Mar 2025 registration, ground cleared.
  3. Oct–Dec 2024Ground texture changes suggest early preparatory work.
  4. Apr–May 2024Little change, bare earth visible around the pin.
  5. Jan–Mar 2024Earthwork and ground clearing visible near the ring.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Pune Railway Station1.1 km
  • Magarpatta City7 km
  • Pune Airport (Lohegaon)7.2 km
  • World Trade Center, Kharadi9.2 km

Nearby

  • CollegeCOEP Technological University0.7 km
  • HospitalSassoon General Hospital1 km
  • Railway stationPune1.1 km
  • Bus standPune1.2 km
  • HospitalKEM Hospital1.3 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Project facts

Amenities

  • Equipped with red water pipes and intelligent electricity management systems. (the builder's site)
  • Holds IGBC Gold Pre-certification with solar and rainwater harvesting features. (the builder's site)

Last checked 5 Nov 2026.

MahaRERA record

From MahaRERA, read 12 Nov 2026

Possession date

30 Jan 2032 to 30 Oct 2032

The completion dates filed with MahaRERA for its 2 registrations; each is in the table of towers and phases below.

For P52100079533: 30 Jan 2032. The completion date filed with MahaRERA is 30 Jan 2032; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Sep 2031.

The record

Homes booked
341 of 578
Across all 2 of its MahaRERA registrations. P52100079533 alone: 185 of 285.
Towers
2 in this registration
The tallest has 32 floors. 4 in the whole project (builder's site).
Units
285
279 homes, 6 shops or offices.
Registered on
10 Mar 2025
Main MahaRERA registration
P52100079533
Listed or updated on MahaRERA 31 Oct 2026.
Promoter (builder)
Birla Estates Private Limited
Project type
Others
Pincode
411001

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Completion is filed for Jan 2032, about 5 years away. Until then you may pay rent and loan interest (pre-EMI) together; ask for a construction-linked payment plan.
  • Towers go up to 32 floors. Ask how many lifts serve your tower and how many homes share them.

Tower by tower

2 registrations, 2 buildings

Towers and phases (2 registrations)

From MahaRERA

MahaRERA holds Birla Punya as 2 registrations. Together they list 578 homes, 341 booked.

RegistrationCompletion filedBooked
Birla Punya Phase 1P52100079533 (opens in a new tab)30 Jan 2032at registration 30 Sep 2031185 of 285
Birla Punya Phase IIPR1262022501044 (opens in a new tab)30 Oct 2032at registration 30 Jun 2032156 of 293

Each row is its own MahaRERA registration, as filed.

Buildings

From MahaRERA
BuildingFloorsHomesOther
Tower- A321886
Tower- C31910

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Land
5 acres
From the builder's site
Open space
79%
From the builder's site
Architect
Broadway Malyan
From the builder's site
Design and service partners
Broadway Malyan, JW Consultants LLP, STX Landscape Architects, Terracon Ecotech Pvt. Ltd.
From the builder's site

Last checked 5 Nov 2026. MahaRERA counts where they differ.

Birla Estates: track record

From MahaRERA records

Birla Estates has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Camp

FAQ

What is the price of Birla Punya?

1 BHK: ₹99 L; 2 BHK: ₹1.86 Cr, as listed on the builder's site on 5 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Birla Punya?

The 2 MahaRERA registrations of Birla Punya have filed completion dates from 30 Jan 2032 to 30 Oct 2032. For P52100079533: The completion date filed with MahaRERA is 30 Jan 2032; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Birla Punya?

Birla Punya is registered with MahaRERA in 2 parts (towers or phases): P52100079533, PR1262022501044.

How many towers and floors does Birla Punya have?

MahaRERA lists 2 buildings in registration P52100079533, one of the project's 2, the tallest with 32 floors.

How many flats are there in Birla Punya?

MahaRERA lists 578 units across all 2 of its MahaRERA registrations; P52100079533 has 285.

How many homes in Birla Punya are booked?

341 of 578 homes were booked as per MahaRERA on 12 Nov 2026, across all 2 of its MahaRERA registrations.

Who is the builder of Birla Punya?

The promoter registered with MahaRERA is Birla Estates Private Limited.

Where is Birla Punya?

Birla Punya is in Pune City, Pune district (pincode 411001).

Which hospital is nearest to Birla Punya?

Sassoon General Hospital, about 1 km away in a straight line from the map position; the drive is longer.

Which railway station is nearest to Birla Punya?

Pune, about 1.1 km away in a straight line from the map position; the drive is longer.

How far is Birla Punya from Pune Airport?

About 7.2 km in a straight line from the map position; the drive is longer.

How far is Birla Punya from Magarpatta City?

About 7 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Birla Punya.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 31 Oct 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 5 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 5 Nov 2026

  • Location and nearbyGathered and checked

    Checked 5 Nov 2026

  • DescriptionGathered and checked

    Checked 5 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (5 Nov 2026)

  • Rough price guideGathered and checked

    An asking price seen on one site, rounded and checked against the area (5 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (5 Nov 2026)

Get the price sheet and floor plans for Birla Punya Phase 1

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment