Celestia, Phursungi

See the site from above today

by Malpani Properties · Phursungi, Haveli, Pune district · 412308

Homes
2 BHK
Price
from ₹49.5 L
EMI about ₹34,366 a month
Possession
Apr 2029
completion filed with MahaRERA
Booked
188 of 526

What stands out

As of 20 Nov 2026, from MahaRERA and the sources below.

  • 36% of homes booked: MahaRERA shows 188 of 526 homes booked.
  • Buildings in this registration: 4, up to 16 floors.
  • 36% booked here; the middle of 12 Phursungi projects registered within a year of it is 28%.
  • Compared with other projects still being built in Phursungi: Compared with other projects still being built in Phursungi: this registration has more homes than 28 of 28.
  • Completion date filed with MahaRERA: 30 Apr 2029.

Updated 21 Nov 2026

Price

  • 2 BHK

    ₹49.5 L – ₹51.5 L

    Last checked 8 Nov 2026

    All-in cost of the 2 BHK at ₹49.5 L: about ₹55.74 L
    Price (agreement value)₹49.5 L
    GST (5%)₹2.48 L
    Stamp duty (7%)₹3.46 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹55.74 L

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹34,366 a monthOn a ₹39.6 L loan (80% of ₹49.5 L) at 8.5% for 20 years. Ask your bank for its rate.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Celestia from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Celestia, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Jan 2025 and Feb 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Celestia from above, satellite picture of Nov 2022
    Nov 2022
  2. Celestia from above, satellite picture of Jan 2024
    Jan 2024
  3. Celestia from above, satellite picture of Jan 2025
    Jan 2025
  4. Celestia from above, satellite picture of Feb 2026
    Feb 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

The site inside the ring shows persistent cleared ground with minimal change.

possession filed for Apr 2029

Month by month, Jan 2021 to Nov 2026: 41 clear months, October to May (the monsoon is under cloud).

Satellite pictures show the land inside the ring remained largely vegetated and undeveloped through late 2024. Ground clearing and initial site preparation become visible following the November 2024 registration.

The seasons before

  1. Apr–May 2026Dry cleared land remains visible within the ring area, little change.
  2. Jan–Mar 2026Ground preparation and cleared areas persist inside the ring, little change.
  3. Oct–Dec 2025Open ground and subtle construction footprints remain visible inside the ring, little change.
Construction proof from space: Jan 2021 to Nov 2026, Copernicus Sentinel-2 (13 earlier seasons)
  1. Apr–May 2025Bare soil and active ground clearing continue inside the ring, little change.
  2. Jan–Mar 2025Cleared ground and initial footprints appear inside the ring, changing the site.
  3. Oct–Dec 2024Work shows after the Nov 2024 registration with ground clearing inside the ring.
  4. Apr–May 2024Dry soil and minimal vegetation dominate the ring area, little change.
  5. Jan–Mar 2024Ground remains mostly clear with sparse plant cover inside the ring, little change.
  6. Oct–Dec 2023Sparse vegetation returns to the ring following seasonal rains, little change.
  7. Apr–May 2023Dry conditions continue with exposed earth visible in the ring, little change.
  8. Jan–Mar 2023Ground shows open soil and low vegetation inside the ring, little change.
  9. Oct–Dec 2022Slight green patches appear inside the ring following the monsoon season.
  10. Jan–Mar 2022Ground shows reduced plant cover and open earth inside the ring, little change.
  11. Oct–Dec 2021Vegetation increases slightly after monsoon rains inside the ring, little change.
  12. Apr–May 2021Dry soil and sparse vegetation remain visible in the ring, little change.
  13. Jan–Mar 2021Ground shows sparse vegetation and open patches inside the ring, little change.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Magarpatta City6.9 km
  • World Trade Center, Kharadi9.4 km
  • EON IT Park, Kharadi9.5 km
  • Pune Railway Station12.3 km

Nearby

  • CollegePDEA's Annasaheb Magar Mahavidyalaya4.2 km
  • Bus standAkashwwani4.4 km
  • Railway stationManjari Budruk4.6 km
  • CollegeKeystone School of Engineering4.7 km
  • SchoolThe Kalyani School4.8 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

MahaRERA record

From MahaRERA, read 20 Nov 2026

Possession date

30 Apr 2029

The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2028.

Beside other Phursungi projects

Worked out by Avasetu
Homes booked
36%
The middle of 11 Phursungi projects registered within a year of it: 31%.
Completion date
Not moved by the builder
5 of 34 Phursungi projects being built moved theirs 3 months or more.

From MahaRERA records read 20 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
188 of 526
Towers
4 in this registration
The tallest has 16 floors.
Units
526
506 homes, 20 shops or offices.
Registered on
29 Nov 2024
MahaRERA registration
P52100078194
Listed or updated on MahaRERA 11 Jun 2026.
Promoter (builder)
Malpani Properties
Project type
Others
Pincode
412308

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • 20 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

4 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
B WING161120
C WING161125
D WING1414415
A WING161380

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Land
4 acres

Last checked 8 Nov 2026. MahaRERA counts where they differ.

Malpani Properties: track record

From MahaRERA records

Malpani Properties has 4 projects in our MahaRERA register for Pune.

All 4 projects by Malpani Properties in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Phursungi

More by Malpani Properties

FAQ

What is the price of Celestia?

2 BHK: ₹49.5 L to ₹51.5 L, checked on 8 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Celestia?

The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Celestia?

Celestia is registered with MahaRERA as P52100078194.

How many towers and floors does Celestia have?

MahaRERA lists 4 buildings, the tallest with 16 floors.

How many flats are there in Celestia?

MahaRERA lists 526 units (506 residential, 20 other).

How many homes in Celestia are booked?

188 of 526 homes were booked as per MahaRERA on 20 Nov 2026.

Who is the builder of Celestia?

The promoter registered with MahaRERA is Malpani Properties. Our register has 4 Pune projects by Malpani Properties.

Where is Celestia?

Celestia is in Haveli, Pune district (pincode 412308).

Which school is nearest to Celestia?

The Kalyani School, about 4.8 km away in a straight line from the map position; the drive is longer.

Which railway station is nearest to Celestia?

Manjari Budruk, about 4.6 km away in a straight line from the map position; the drive is longer.

How far is Celestia from Magarpatta City?

About 6.9 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Celestia.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 11 Jun 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 8 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 8 Nov 2026

  • Location and nearbyGathered and checked

    Checked 8 Nov 2026

  • DescriptionGathered and checked

    Checked 8 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (8 Nov 2026)

Get the price sheet and floor plans for CELESTIA

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment