Majestique Evolvus from space, 2023 to 2026
The ground around the project's map pin, seen by the Sentinel-2 satellite once each dry season from Jan 2023 to Oct 2026.
12 seasons, Jan 2023 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Central building casts extensive dark shadows northward across the cleared ring.
- Apr–May 2026Central structure appears wider and brighter against adjacent shaded ground.
- Jan–Mar 2026Building structure thickens and casts prominent northern winter shadows across the plot.
- Oct–Dec 2025Central structure footprint enlarges with deep dark shadows extending across adjacent ground.
- Apr–May 2025Building footprint expands centrally with distinct dark shadows cast to the west.
- Jan–Mar 2025Bright building footprint visible in the centre casting shadows to the north-west.
- Oct–Dec 2024Early foundation excavation and structural footings appear in the ring centre.
- Apr–May 2024Central ground shows excavation marks and earthworks with minimal plant cover.
- Jan–Mar 2024Ground cleared across the ring following the Jan 2024 registration; vegetation reduced.
- Oct–Dec 2023Vegetation increases in the southern section while the central plot remains open.
- Apr–May 2023Ground across the ring appears drier with sparse green cover remaining.
- Jan–Mar 2023Partially cleared land with scattered vegetation sits bounded by roadways on multiple sides.
Majestique Evolvus: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.