F Premium from space, 2023 to 2026
Satellite imagery shows the ring area transitioning from vacant land and vegetation in 2021 to active ground clearing in late 2022. Following the May 2024 registration, excavation and tall building footprints appear, with prominent shadows confirming vertical construction through 2026.
12 seasons, Jan 2023 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Ongoing construction shadows show active development aligning with the registered building plans.
- Apr–May 2026Little change, established structural footprints and casting shadows remain visible in the ring.
- Jan–Mar 2026Prominent dark shadows verify substantial vertical construction following the 2024 project registration.
- Oct–Dec 2025Ground cleared
- Apr–May 2025Little change, construction shadows and structural footprints persist inside the ring area.
- Jan–Mar 2025Tall building shadows cast northwest, showing vertical growth after the May 2024 registration.
- Oct–Dec 2024Dark shadows from emerging tall structures indicate building activity within the ring.
- Apr–May 2024Little change, cleared earth and early structural layout visible following registration.
- Jan–Mar 2024Ground preparation and excavation footprints expand ahead of the May 2024 registration.
- Oct–Dec 2023Initial foundation footprints and excavated soil patches emerge within the ring area.
- Apr–May 2023Little change, cleared ground and disturbed soil visible inside the yellow ring.
- Jan–Mar 2023Ground clearing continues with earthwork visible and reduced vegetation in the ring.
F Premium: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.