Skip to main contentSkip to navigation

F Signature By Aishwaryam from space, 2024 to 2026

Registered with MahaRERA in Apr 2026. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

Today, from Google satellite, centred on the same map pin.

9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Tall building shadows and structured footprints visible within and near the ring.
  2. Apr–May 2026Excavation and ground clearing visible inside the ring following new registrations.
  3. Jan–Mar 2026Tall building shadows fall across the ring from adjacent structures.
  4. Oct–Dec 2025Dark shadow of a tall building extends into the ring from the south.
  5. Apr–May 2025Dry open land persists inside the ring with little change.
  6. Jan–Mar 2025Earthwork continues with bare soil visible across the ring area.
  7. Oct–Dec 2024Ring shows cleared ground and localized blue structures. Little change.
  8. Apr–May 2024Dry conditions with cleared earth and minimal vegetation inside the ring.
  9. Jan–Mar 2024Ground remains mostly bare with slight excavation signs inside the ring.

F Signature By Aishwaryam: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.