Skip to main contentSkip to navigation
MahaRERA registered P52100049477Verify on MahaRERA (opens in a new tab)

Harit Gathagram Sector 3 Phase 1, Dehu

Filed on MahaRERA as GATHAGRAM SECTOR-3 PHASE-1

See the site from above today

by Harit Landmarks LLP · Dehu, Haveli, Pune district · 412109

Price
from ₹36 L
EMI about ₹24,993 a month
Possession
from Jul 2028
its parts filed Jul 2028 to Mar 2029
Booked
86 of 715
across all 3 of its MahaRERA registrations

What stands out

As of 19 Nov 2026, from MahaRERA and the sources below.

  • Zero bookings registration: No homes are booked in this registration of 190 units.
  • Across all three registrations, 86 of 715 homes are booked, about 12%.
  • MahaRERA filing adds months: The completion date filed with MahaRERA is 30 Jul 2028, while the registration date is 31 Mar 2026, so MahaRERA added months.
  • The registration includes two buildings up to 13 floors, classifying it as a mid-rise project.
  • All unit prices start at ₹36 L.

Updated 21 Nov 2026

Price

  • Homes

    ₹36 L – ₹54.5 L

    Last checked 19 Nov 2026

    All-in cost of a home at ₹36 L: about ₹40.62 L
    Price (agreement value)₹36 L
    GST (5%)₹1.8 L
    Stamp duty (7%)₹2.52 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹40.62 L

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹24,993 a monthOn a ₹28.8 L loan (80% of ₹36 L) at 8.5% for 20 years. Ask your bank for its rate.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Harit Gathagram Sector 3 Phase 1 from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Harit Gathagram Sector 3 Phase 1, year by year, up close

Sharp satellite pictures taken in Feb 2022, Oct 2023 and Feb 2025, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Harit Gathagram Sector 3 Phase 1 from above, satellite picture of Feb 2022
    Feb 2022
  2. Harit Gathagram Sector 3 Phase 1 from above, satellite picture of Oct 2023
    Oct 2023
  3. Harit Gathagram Sector 3 Phase 1 from above, satellite picture of Feb 2025
    Feb 2025 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Final views show stable cleared plots and roads.

possession filed for from Jul 2028

Month by month, Jan 2021 to Nov 2026: 42 clear months, October to May (the monsoon is under cloud).

The site transitions from barren land in 2021 to structured plot divisions and road networks following the 2023 MahaRERA registrations, with no major vertical structures casting shadows visible within the ring.

The seasons before

  1. Apr–May 2026Dry ground with clear boundaries around the ring.
  2. Jan–Mar 2026Little change with established internal paths.
  3. Oct–Dec 2025Surrounding development persists with structured plots.
Construction proof from space: Jan 2021 to Nov 2026, Copernicus Sentinel-2 (13 earlier seasons)
  1. Apr–May 2025Little change, dry earth and clear road alignments.
  2. Jan–Mar 2025Stable ground conditions with visible access roads.
  3. Oct–Dec 2024Surrounding area shows persistent road grids and cleared land.
  4. Apr–May 2024Little change, dry soil and established road tracks.
  5. Jan–Mar 2024Cleared land and road layouts visible inside and around the ring.
  6. Oct–Dec 2023New road grids and plot divisions appear around the ring following later registrations.
  7. Apr–May 2023Dry conditions with clear earth paths forming.
  8. Jan–Mar 2023Work shows after the Feb 2023 registration with cleared earth inside the ring.
  9. Oct–Dec 2022Ground clearing and early road layouts appear near the ring.
  10. Jan–Mar 2022Ground remains mostly bare with slight vegetation traces.
  11. Oct–Dec 2021Some seasonal vegetation growth visible around the ring.
  12. Apr–May 2021Little change, dry ground visible inside the ring.
  13. Jan–Mar 2021Barren land with sparse vegetation inside the ring; little change overall.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)15.8 km
  • Baner-Balewadi High Street17.5 km
  • Pune Airport (Lohegaon)21.1 km
  • Pune Railway Station24.1 km

Nearby

  • TempleSant Tukaram Maharaj Gatha Mandir1.6 km
  • Bus standDehugaon1.9 km
  • TempleJagadguru Sant Shree Tukaram Maharaj Mandir, Dehu2.1 km
  • Industrial areaPesh Technology Park - Office Space for Rent2.7 km
  • CollegeSiddhant College of Engineering4.5 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

MahaRERA record

From MahaRERA, read 19 Nov 2026

Possession date

30 Jul 2028 to 30 Mar 2029

The completion dates filed with MahaRERA for its 3 registrations; each is in the table of towers and phases below.

For P52100049477: 30 Jul 2028. Completion date filed with MahaRERA. At registration: 31 Mar 2026. Moved 24 months later, 4 of them by MahaRERA's August 2026 order for most projects.

Ask for the possession date in writing in your agreement for sale.

The record

Homes booked
86 of 715
Across all 3 of its MahaRERA registrations. P52100049477 alone: 0 of 190.
Towers
2 in this registration
The tallest has 13 floors.
Registered on
15 Feb 2023
Main MahaRERA registration
P52100049477
Listed or updated on MahaRERA 21 Aug 2026.
Promoter (builder)
Harit Landmarks LLP
Project type
Residential / Group Housing
Pincode
412109

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • The builder has moved the completion date 24 months later since registration, from Mar 2026 to Jul 2028 (MahaRERA's 2026 blanket extension for all projects left out). Ask why, and which date goes in your agreement for sale.
  • Only 0% of homes are booked 3 years after registration. Slow sales can slow building: check the progress the builder files with MahaRERA every quarter.

Tower by tower

3 registrations, 2 buildings

Towers and phases (3 registrations)

From MahaRERA

MahaRERA holds Harit Gathagram Sector 3 Phase 1 as 3 registrations. Together they list 715 homes, 86 booked.

RegistrationCompletion filedBooked
GATHAGRAM SECTOR-3 PHASE-1P52100049477 (opens in a new tab)30 Jul 2028at registration 31 Mar 20260 of 190
Gathagram Sector 2P52100053002 (opens in a new tab)30 Mar 2029at registration 30 Nov 202676 of 444
Gathagram Sector 5 Phase 1P52100053456 (opens in a new tab)30 Mar 2029at registration 30 Nov 202610 of 81

Each row is its own MahaRERA registration, as filed.

Buildings

From MahaRERA
BuildingFloorsHomesOther
R-15A-LIG113950
R-15 B -LIG213950

As filed with MahaRERA (sanctioned floors).

Harit Landmarks LLP: track record

From MahaRERA records

Harit Landmarks LLP has 2 projects in our MahaRERA register for Pune.

All 2 projects by Harit Landmarks LLP in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Dehu

More by Harit Landmarks LLP

FAQ

What is the price of Harit Gathagram Sector 3 Phase 1?

Homes from ₹36 L to ₹54.5 L, checked on 19 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Harit Gathagram Sector 3 Phase 1?

The 3 MahaRERA registrations of Harit Gathagram Sector 3 Phase 1 have filed completion dates from 30 Jul 2028 to 30 Mar 2029. For P52100049477: The completion date filed with MahaRERA is 30 Jul 2028. At registration it was 31 Mar 2026. MahaRERA added 4 months to most projects' dates in August 2026 (Order 66/2026). Ask the builder for the possession date in your agreement, in writing.

What is the MahaRERA number of Harit Gathagram Sector 3 Phase 1?

Harit Gathagram Sector 3 Phase 1 is registered with MahaRERA in 3 parts (towers or phases): P52100049477, P52100053002, P52100053456.

How many towers and floors does Harit Gathagram Sector 3 Phase 1 have?

MahaRERA lists 2 buildings in registration P52100049477, one of the project's 3, the tallest with 13 floors.

How many flats are there in Harit Gathagram Sector 3 Phase 1?

MahaRERA lists 715 units across all 3 of its MahaRERA registrations; P52100049477 has 190.

How many homes in Harit Gathagram Sector 3 Phase 1 are booked?

86 of 715 homes were booked as per MahaRERA on 19 Nov 2026, across all 3 of its MahaRERA registrations.

Who is the builder of Harit Gathagram Sector 3 Phase 1?

The promoter registered with MahaRERA is Harit Landmarks LLP. Our register has 2 Pune projects by Harit Landmarks LLP.

Where is Harit Gathagram Sector 3 Phase 1?

Harit Gathagram Sector 3 Phase 1 is in 412109, Haveli, Pune district (pincode 412109).

How far is Harit Gathagram Sector 3 Phase 1 from Pune Airport?

About 21.1 km in a straight line from the map position; the drive is longer.

How far is Harit Gathagram Sector 3 Phase 1 from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 15.8 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Harit Gathagram Sector 3 Phase 1.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 21 Aug 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 19 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 10 Nov 2026

  • Location and nearbyGathered and checked

    Checked 19 Nov 2026

  • DescriptionGathered and checked

    Checked 19 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (19 Nov 2026)

Get the price sheet and floor plans for GATHAGRAM SECTOR-3 PHASE-1

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment