Gera Avive Towers Phase I from space, 2021 to 2026
Registered with MahaRERA in Jul 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.
41 clear months, Jan 2021 to Nov 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Prominent building footprints with long shadows cast southward across the ring.
- Apr–May 2026Bright footprint and excavated surfaces appear inside the eastern half of ring.
- Oct–Dec 2025Work shows after Jul 2025 registration with deeper shadows and ground changes.
- Oct–Dec 2024Dark shadow extends along southern edge; ring surface remains largely open.
- Oct–Dec 2023Broad cleared ground remains; adjacent construction visible to the west.
- Apr–May 2023Bright paved or cleared ground extends along the ring's northwest edge.
- Jan–Mar 2023Most vegetation is gone; cleared ground covers the ring interior.
- Oct–Dec 2022Dark shadow appears northwest; ground in ring is partially disturbed.
- Jan–Mar 2022Patches of green remain amid widespread bare earth in the ring.
- Oct–Dec 2021Vegetation inside the ring decreases as surrounding plots undergo earthmoving.
- Jan–Mar 2021Greenery covers central ring; surrounding ground exhibits early clearing and tracks.
Gera Avive Towers Phase I: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.