Gera Island of Joy Project from space, 2022 to 2026

From 2022 to 2026, the site changed from bare open ground to extensive construction with multiple building footprints and tall structures appearing around and inside the ring after registrations.

Today, from Google satellite, centred on the same map pin.

14 seasons, Jan 2022 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Jan–Mar 2025Tall structures cast shadows northward as work expands.
  2. Oct–Dec 2024New building footprints and footprints appear around the ring.
  3. Jan–Mar 2024Excavation and earthwork visible near and inside the ring.
  4. Oct–Dec 2023Ground clearance starts just outside the ring following registrations.
  5. Jan–Mar 2023Plant cover decreases across the ring area.
  6. Jan–Mar 2022Ground is bare and open with sparse vegetation near the river.

Gera Island of Joy Project: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.