Godrej Evergreen Square from space, 2023 to 2026
Satellite imagery shows the site remaining largely vacant with seasonal vegetation until late 2024. Following the November 2024 MahaRERA registration, ground clearing and new building footprints begin to emerge inside the ring.
12 seasons, Jan 2023 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Little change, structured layouts continue to develop near the pin.
- Apr–May 2026Little change, construction footprints remain active within the ring.
- Jan–Mar 2026Building footprints become clearer with emerging structural shadows.
- Oct–Dec 2025New structures and shadows indicate building footprints forming.
- Apr–May 2025Little change, ongoing ground preparation and clearing near the pin.
- Jan–Mar 2025Ground clearing expands and construction activity appears inside the ring.
- Oct–Dec 2024Work shows after the Nov 2024 registration, with new ground clearing.
- Apr–May 2024Little change, dry soil visible with no major alterations.
- Jan–Mar 2024Little change, vegetation cover stays low inside the ring.
- Oct–Dec 2023Little change, ground features remain consistent with prior seasons.
- Apr–May 2023Little change, dry conditions persist around the ring.
- Jan–Mar 2023Little change, stable terrain with low plant cover.
Godrej Evergreen Square: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.