Guruvista Phase 3, Lonikand
by Arham Realty · Lonikand, Haveli, Pune district · 412216
- Price
- from ₹75 L
- EMI about ₹52,069 a month
- Possession
- Apr 2032
- completion filed with MahaRERA
- Booked
- 44 of 259
- 2 booked in the last 30 days
What stands out
As of 13 Nov 2026, from MahaRERA and the sources below.
- Only 17% of homes booked: Buyers have committed to 44 of the 259 homes in this registration.
- The project is registered for delivery by 30 Apr 2032. MahaRERA's order added 4 months to the original date of 31 Dec 2031.
- All homes across this phase begin at ₹75 L, with 2 and 3 BHK apartment layouts on offer.
- This phase contains 3 buildings rising up to 13 floors, with about 86 homes per building.
Updated 21 Nov 2026
Price
Homes
₹75 L – ₹95 L
Last checked 20 Nov 2026
All-in cost of a home at ₹75 L: about ₹84.3 L
Price (agreement value) ₹75 L GST (5%) ₹3.75 L Stamp duty (7%) ₹5.25 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹84.3 L
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹52,069 a monthOn a ₹60 L loan (80% of ₹75 L) at 8.5% for 20 years. Ask your bank for its rate.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Guruvista Phase 3, year by year, up close
Sharp satellite pictures taken in Nov 2022 and Jan 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.
Nov 2022 Jan 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Work hubs
- EON IT Park, Kharadi9.7 km
- World Trade Center, Kharadi9.9 km
- Pune Airport (Lohegaon)12 km
- Magarpatta City14.3 km
Nearby
- CollegeShree Ramchandra College of Engineering1.6 km
- SchoolBjs School Wagholi3 km
- CollegeBSIOTR (Bhivarabai Sawant Institute Of Technology And Research)3.1 km
- CollegeJSPM University Pune3.3 km
- SchoolSanskriti School - Wagholi Campus4 km
Straight-line distances; the drive is longer. Places: Google Maps.
Project facts
- Available in 2 and 3 BHK apartment configurations.
Last checked 20 Nov 2026.
MahaRERA record
From MahaRERA, read 13 Nov 2026Possession date
30 Apr 2032
The completion date filed with MahaRERA is 30 Apr 2032; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2031.
Guruvista Phase 3: what changed, as we read it
2 more homes booked between 14 Oct 2026 and 13 Nov 2026: 42 to 44, of 259 homes.
- 13 Nov 2026: 44 booked
- 14 Oct 2026: 42 booked
Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.
Beside other Lonikand projects
Worked out by Avasetu- Completion date
- Not moved by the builder
- 2 of 8 Lonikand projects being built moved theirs 3 months or more.
From MahaRERA records read 13 Nov 2026. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 44 of 259
- Towers
- 3 in this registration
- The tallest has 13 floors.
- Registered on
- 29 Apr 2024
- MahaRERA registration
- P52100055898
- Listed or updated on MahaRERA 27 Oct 2026.
- Promoter (builder)
- Arham Realty
- Project type
- Others
- Pincode
- 412216
Check before you book
From MahaRERA- Completion is filed for Apr 2032, about 5 years away. Until then you may pay rent and loan interest (pre-EMI) together; ask for a construction-linked payment plan.
- Only 17% of homes are booked 2 years after registration. Slow sales can slow building: check the progress the builder files with MahaRERA every quarter.
Tower by tower
3 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| WING -B | 13 | 107 | 0 |
| WING - C | 13 | 104 | 0 |
| Wing - A | 7 | 48 | 0 |
As filed with MahaRERA (sanctioned floors).
Arham Realty: track record
From MahaRERA recordsArham Realty has 1 project in our MahaRERA register for Pune.
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Lonikand
FAQ
What is the price of Guruvista Phase 3?
Homes from ₹75 L to ₹95 L, checked on 20 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of Guruvista Phase 3?
The completion date filed with MahaRERA is 30 Apr 2032; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of Guruvista Phase 3?
Guruvista Phase 3 is registered with MahaRERA as P52100055898.
How many towers and floors does Guruvista Phase 3 have?
MahaRERA lists 3 buildings, the tallest with 13 floors.
How many flats are there in Guruvista Phase 3?
MahaRERA lists 259 units.
How many homes in Guruvista Phase 3 are booked?
44 of 259 homes were booked as per MahaRERA on 13 Nov 2026.
Who is the builder of Guruvista Phase 3?
The promoter registered with MahaRERA is Arham Realty.
Where is Guruvista Phase 3?
Guruvista Phase 3 is in 412216, Haveli, Pune district (pincode 412216).
Which school is nearest to Guruvista Phase 3?
Bjs School Wagholi, about 3 km away in a straight line from the map position; the drive is longer.
How far is Guruvista Phase 3 from Pune Airport?
About 12 km in a straight line from the map position; the drive is longer.
How far is Guruvista Phase 3 from EON IT Park, Kharadi?
About 9.7 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Guruvista Phase 3.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 27 Oct 2026
- Dates and homes bookedFrom MahaRERA
Checked 20 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 9 Nov 2026
- Location and nearbyGathered and checked
Checked 20 Nov 2026
- DescriptionGathered and checked
Checked 20 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (20 Nov 2026)
- Project facts and amenitiesGathered and checked
The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (20 Nov 2026)
Get the price sheet and floor plans for GURUVISTA PHASE 3
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.