Mahindra Happinest Tathawade Phase-1 from space, 2021 to 2026

Satellite imagery shows initial ground clearing around the pin starting in 2021, followed by the appearance of dark shadows from tall buildings by late 2023, matching the registration timeline of Happinest Tathawade Phase-1.

Today, from Google satellite, centred on the same map pin.

18 seasons, Jan 2021 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Tall structure shadows stretch across the ring with surrounding cleared land.
  2. Apr–May 2026Little change, structural shadows and cleared ground remain clearly visible.
  3. Jan–Mar 2026Dark building shadows dominate the northern section of the ring.
  4. Oct–Dec 2025Persistent shadows from tall buildings visible near the map pin.
  5. Apr–May 2025Little change, structural shadows and cleared terrain visible in the ring.
  6. Jan–Mar 2025Tall building shadows remain prominent with cleared ground surrounding them.
  7. Oct–Dec 2024Dark shadows of tall buildings continue to fall near the ring.
  8. Apr–May 2024Little change, shadows persist alongside cleared ground near the pin.
  9. Jan–Mar 2024Long shadows from tall structures stretch across the ring area.
  10. Oct–Dec 2023Dark shadows appear near the ring, indicating new tall structures.
  11. Apr–May 2023Little change, dry terrain and sparse features persist in the area.
  12. Jan–Mar 2023Slight clearing observed with reduced plant cover inside the ring.
  13. Oct–Dec 2022Ground shows subtle modifications with minor clearing and scattered structures.
  14. Apr–May 2022Dry soil and sparse patches visible within the yellow ring area.
  15. Jan–Mar 2022Sparse vegetation and cleared earth visible, showing little change overall.
  16. Oct–Dec 2021Ground remains mostly cleared with minor clearing visible near the ring.
  17. Apr–May 2021Little change, dry ground visible inside the ring with faint clearing.
  18. Jan–Mar 2021Ground cleared near the pin with sparse plants and small structures visible.

Mahindra Happinest Tathawade Phase-1: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.