Infinity Avana, Tathawade
See the site from above todayby Tulip Infra · Tathawade, Mulshi, Pune district · 411033
- Possession
- Apr 2027
- completion filed with MahaRERA
- Booked
- 378 of 559
As of 11 Nov 2026, Infinity Avana by Tulip Infra in Tathawade, Pune district is registered with MahaRERA as P52100047662. The completion date filed with MahaRERA is 30 Apr 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). MahaRERA shows 378 of 559 homes booked. That is 68% booked, against 67% for the middle of 50 Tathawade projects registered within a year of it.
Updated 21 Nov 2026
Our team is still collecting details on Infinity Avana.
We do not have prices, the builder's pictures and floor plans yet. What you see here is what we have now: MahaRERA's record, read on the date shown. Ask us and we send you what we find first.
Price
No price for Infinity Avana is published yet.
What new homes in Tathawade usually ask
- 2 BHK about ₹70 – 90 L (39 projects)
- 2.5 BHK about ₹90 L – ₹1.1 Cr (4 projects)
- 3 BHK about ₹90 L – ₹1.3 Cr (38 projects)
- 4 BHK about ₹1.3 – 2 Cr (7 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Tathawade, rounded. Use it to judge an offer, not as a price.
Tathawade average ₹10,852/sq ft across 19 projectsThe middle asking price per sq ft of other projects in Tathawade.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
Infinity Avana from above, today
Infinity Avana, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.
Nov 2022 Jan 2024 Feb 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Oct–Dec 2026 (looked Nov 2026)
Final views show established structures and shadows.
Registered with MahaRERA Nov 2022 · possession filed for Apr 2027
The ground around the project's map pin, seen by the Sentinel-2 satellite once each dry season from Jan 2021 to Oct 2026.
The seasons before
- Apr–May 2026Little change, site mostly built up.
- Jan–Mar 2026Long shadows indicate tall buildings present.
- Oct–Dec 2025New structures visible outside ring.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2 (14 earlier seasons)
- Apr–May 2025Little change, dry conditions.
- Jan–Mar 2025Tall building shadows grow more prominent.
- Oct–Dec 2024Vegetation spots return nearby.
- Apr–May 2024Little change, ground remains cleared.
- Jan–Mar 2024Dark shadows from tall structures cast northwest.
- Oct–Dec 2023Ground cleared further around the ring.
- Apr–May 2023Little change, bright structures persist.
- Jan–Mar 2023New building shadows appear, construction active.
- Oct–Dec 2022Work shows after the Nov 2022 registration with bright structures.
- Apr–May 2022Dry soil and sparse vegetation.
- Jan–Mar 2022Plant cover increases, little change.
- Oct–Dec 2021Green vegetation appears, little change otherwise.
- Apr–May 2021Little change, dry ground visible.
- Jan–Mar 2021Ground cleared, plants inside ring, little change since before.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)5.1 km
- Baner-Balewadi High Street7.8 km
- Pune Railway Station17.7 km
- Pune Airport (Lohegaon)17.8 km
Nearby
- CollegeD.Y. Patil College of Engineering1.3 km
- ShoppingD Mart Ravet1.4 km
- CollegeD. Y. Patil International University1.5 km
- SchoolS.B. Patil Public School (SBPPS) Ravet, Pune2 km
- Railway stationAkurdi2 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
MahaRERA record
From MahaRERA, read 11 Nov 2026Possession date
30 Apr 2027
The completion date filed with MahaRERA is 30 Apr 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2026.
Beside other Tathawade projects
Worked out by Avasetu- Homes booked
- 68%
- The middle of 50 Tathawade projects registered within a year of it: 67%.
- Completion date
- Not moved by the builder
- 53 of 233 Tathawade projects being built moved theirs 3 months or more.
From MahaRERA records read 11 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 378 of 559
- Towers
- 5 in this registration
- The tallest has 35 floors.
- Units
- 559
- 507 homes, 52 shops or offices.
- Registered on
- 17 Nov 2022
- MahaRERA registration
- P52100047662
- Listed or updated on MahaRERA 9 May 2026.
- Promoter (builder)
- Tulip Infra
- Project type
- Others
- Pincode
- 411033
Check before you book
From MahaRERA- Towers go up to 35 floors. Ask how many lifts serve your tower and how many homes share them.
- 52 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.
Tower by tower
5 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| A WING | 35 | 108 | 34 |
| B WING | 35 | 120 | 0 |
| C WING | 35 | 119 | 10 |
| D WING | 35 | 120 | 8 |
| MHADA WING | 10 | 40 | 0 |
As filed with MahaRERA (sanctioned floors).
Tulip Infra: track record
From MahaRERA recordsTulip Infra has 2 projects in our MahaRERA register for Pune.
- INFINITY EVANAcompletion filed 30 Oct 2029, moved 6 months later
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Tathawade
More by Tulip Infra
FAQ
What is the price of Infinity Avana?
No price for Infinity Avana is published yet. Ask through the enquiry form on this page for the current price.
What is the possession date of Infinity Avana?
The completion date filed with MahaRERA is 30 Apr 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of Infinity Avana?
Infinity Avana is registered with MahaRERA as P52100047662.
How many towers and floors does Infinity Avana have?
MahaRERA lists 5 buildings, the tallest with 35 floors.
How many flats are there in Infinity Avana?
MahaRERA lists 559 units (507 residential, 52 other).
How many homes in Infinity Avana are booked?
378 of 559 homes were booked as per MahaRERA on 11 Nov 2026.
Who is the builder of Infinity Avana?
The promoter registered with MahaRERA is Tulip Infra. Our register has 2 Pune projects by Tulip Infra.
Where is Infinity Avana?
Infinity Avana is in Mulshi, Pune district (pincode 411033).
Which school is nearest to Infinity Avana?
S.B. Patil Public School (SBPPS) Ravet, Pune, about 2 km away in a straight line from the map position; the drive is longer.
Which railway station is nearest to Infinity Avana?
Akurdi, about 2 km away in a straight line from the map position; the drive is longer.
How far is Infinity Avana from Pune Airport?
About 17.8 km in a straight line from the map position; the drive is longer.
How far is Infinity Avana from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?
About 5.1 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Infinity Avana.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 9 May 2026
- Dates and homes bookedFrom MahaRERA
Checked 19 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 19 Nov 2026
- Location and nearbyGathered and checked
Checked 19 Nov 2026