Infinity Evana from space, 2023 to 2026
Satellite imagery shows the site remained mostly agricultural and cleared until late 2024. Following the December 2024 registration for Infinity Evana, ground clearing, excavation, and structural shadows emerge, indicating active construction within the ring.
12 seasons, Jan 2023 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Multiple building footprints and shadows show active superstructure work.
- Apr–May 2026Active construction continues with visible foundation and frame footprints.
- Jan–Mar 2026Dark shadows from tall structures appear extending northwest.
- Oct–Dec 2025Ground cleared
- Apr–May 2025Bright structures and heavy ground activity emerge in the ring.
- Jan–Mar 2025Excavation and earth moving visible inside the ring.
- Oct–Dec 2024Work shows after the Dec 2024 registration with initial footprint activity.
- Apr–May 2024Exposed earth and soil work visible across the plot.
- Jan–Mar 2024Ground clearing begins with reduced plant cover inside the ring.
- Oct–Dec 2023Little change, vegetation growth increases after monsoon rains.
- Apr–May 2023Dry conditions persist with cleared land inside the ring.
- Jan–Mar 2023Sparse vegetation and open ground dominate the ring area.
Infinity Evana: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.