Skip to main contentSkip to navigation

Ivory Heights from space, 2021 to 2026

The site begins as vacant land and vegetation. Following the November 2023 registration, ground clearance and building footprints appear inside the ring, with tall structures casting shadows by 2025.

Today, from Google satellite, centred on the same map pin.

42 clear months, Jan 2021 to Nov 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Jan–Mar 2026Dark shadows from tall structures persist near the ring.
  2. Jan–Mar 2025Tall building shadows stretch northwest, indicating growing structures.
  3. Jan–Mar 2024New foundation marks visible inside the ring.
  4. Oct–Dec 2023Work shows after the Nov 2023 registration with ground clearance near the pin.
  5. Oct–Dec 2022New large construction footprints appear to the east, just outside the ring.
  6. Jan–Mar 2021Ring shows vacant land and vegetation with a small structure; road visible just outside.

Ivory Heights: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.