K Shire from space, 2021 to 2026
Satellite imagery shows vacant ground initially, followed by ground clearing and the emergence of building footprints and tall structure shadows after the mid-2022 registration, matching the timeline of K Shire Wing A,B,C,D construction.
18 seasons, Jan 2021 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2024Dark shadows cast by tall buildings remain visible across the ring area.
- Jan–Mar 2024Long dark shadows from tall buildings become more prominent in the ring.
- Oct–Dec 2023Dark shadows of tall buildings appear inside the ring pointing north-west.
- Jan–Mar 2023New building footprints appear inside the ring alongside cleared ground.
- Oct–Dec 2022Work shows after the Jun 2022 registration with ground clearing in the ring.
- Jan–Mar 2022Plant cover reduced, leaving bare ground and cleared earth inside the ring.
- Oct–Dec 2021Ground shows increased green plant cover following monsoon rains inside the ring.
- Jan–Mar 2021Bare ground visible in the ring with sparse plants, unchanged from previous season.
K Shire: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.