Skip to main contentSkip to navigation

Kohinoor Avantara from space, 2024 to 2026

Registered with MahaRERA in Jan 2026. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

Today, from Google satellite, centred on the same map pin.

9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Vacant land and sparse greenery visible inside the ring.
  2. Apr–May 2026Dry ground with minimal activity.
  3. Jan–Mar 2026Undeveloped land remains following the January 2026 registration.
  4. Oct–Dec 2025Sparse vegetation appears near the ring.
  5. Apr–May 2025Ground remains unchanged and bare.
  6. Jan–Mar 2025Vacant land persists inside the ring.
  7. Oct–Dec 2024Monsoon vegetation fades into dry ground.
  8. Apr–May 2024Dry earth visible with little change.
  9. Jan–Mar 2024Ground remains undeveloped and clear.

Kohinoor Avantara: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.