KP Supernova, Mohammadwadi
Sold as NIBM by 3 property sites; we list it under Mohammadwadi (pincode 411060).
See the site from above todayby Kanifnath Realtors · Mohammadwadi, Haveli, Pune district · 411060
- Homes
- 2 BHK
- Price
- from ₹80 L
- EMI about ₹55,541 a month
- Possession
- Apr 2030
- completion filed with MahaRERA
- Booked
- 59 of 303
Listed by Royal EstateSee it on Royal Estate's page →
What stands out
As of 10 Nov 2026, from MahaRERA and the sources below.
- Only 59 of the 303 homes are booked, about 19%, which sits near the area median of 6% for similar projects.
- With 303 units, this registration has more homes than 58 of the 63 comparable projects in the area.
Updated 21 Nov 2026
Pictures
From Royal Estate's listing and the builder's brochure, shared by an agent. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.
Price
On offer
Listed by Royal Estate
₹80 L
2 BHK · apartment · 810 sq ft carpet
₹9,877/sq ft
With a home loan, your own cash: about ₹21.9 LYour own cash, about: the part banks may not lend (RBI: 75% to 90% of the price is the most a home loan covers), stamp duty 7% (6% if a woman buys) and registration up to ₹30,000. Add GST (5% on homes being built) if the price leaves it out.
EMI, as an example: about ₹55,541 a monthOn a ₹64 L loan (80% of the price) at 8.5% for 20 years. Ask your bank for its rate.
All-in cost of this home at ₹80 L: about ₹89.9 L
| Price (agreement value)As quoted, before taxes. | ₹80 L |
|---|---|
| GST (5%)On a home being built. | ₹4 L |
| Stamp duty (7%)The rate inside PMC and PCMC limits; 6% if a woman buys. Charged on the ready reckoner value instead when that is higher. | ₹5.6 L |
| Registration (1%, at most ₹30,000) | ₹30,000 |
| Total before the builder's charges | ₹89.9 L |
Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
From the agent's listing, 11 Nov 2026.
Mohammadwadi average ₹13,893/sq ft across 3 projectsThe middle asking price per sq ft of other projects in Mohammadwadi.
Want this at today's price?
Prices change. The Avasetu team confirms today's price, what is still available and the full cost.
KP Supernova from above, today
KP Supernova, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Jan 2025 and Feb 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.
Nov 2022 Jan 2024 Jan 2025 Feb 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Oct–Dec 2026 (looked Nov 2026)
Ring shows ongoing ground activity following registration.
Registered with MahaRERA Oct 2025 · possession filed for Apr 2030
Registered with MahaRERA in Oct 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.
The seasons before
- Apr–May 2026Little change in the cleared project area.
- Jan–Mar 2026Ground preparation continues inside the ring.
- Oct–Dec 2025Work shows after the Oct 2025 registration with cleared ground.
Construction proof from space: Jan 2024 to Oct 2026, Copernicus Sentinel-2 (5 earlier seasons)
- Apr–May 2025Cleared ground persists with bare soil.
- Jan–Mar 2025Ground clearing becomes visible inside the ring.
- Oct–Dec 2024Vegetation cover increases with seasonal rains.
- Apr–May 2024Ground shows dry earth and sparse vegetation.
- Jan–Mar 2024Little change visible in the ring.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- Magarpatta City5.4 km
- Pune Railway Station8.1 km
- World Trade Center, Kharadi10 km
- EON IT Park, Kharadi10.1 km
Nearby
- SchoolDelhi Public School Pune0.8 km
- ShoppingTribeca Highstreet1.3 km
- CollegeVIT, Pune (Kondhwa Campus)3.5 km
- Bus standHadapsar Gadital4.3 km
- TempleISKCON NVCC Pune4.4 km
Straight-line distances; the drive is longer. Places: Google Maps.
MahaRERA record
From MahaRERA, read 10 Nov 2026Possession date
30 Apr 2030
The completion date filed with MahaRERA is 30 Apr 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2029.
Beside other Mohammadwadi projects
Worked out by Avasetu- Homes booked
- 19%
- The middle of 29 Mohammadwadi projects registered within a year of it: 9%.
- Completion date
- Not moved by the builder
- 19 of 75 Mohammadwadi projects being built moved theirs 3 months or more.
From MahaRERA records read 10 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 59 of 303
- Towers
- 2 in this registration
- The tallest has 26 floors.
- Units
- 303
- 267 homes, 36 shops or offices.
- Registered on
- 1 Oct 2025
- MahaRERA registration
- PM1260002501030
- Listed or updated on MahaRERA 25 Mar 2026.
- Promoter (builder)
- Kanifnath Realtors
- Project type
- Mixed
- Pincode
- 411060
Check before you book
From MahaRERA- 36 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.
Tower by tower
2 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| KP SUPERNOVA, WING A | 26 | 267 | 22 |
| KP SUPERNOVA, WING B | 6 | 0 | 14 |
As filed with MahaRERA (sanctioned floors).
What the builder's and property sites say
Gathered and checked- Floors per tower (highest)
- up to 23 floors
Last checked 11 Nov 2026. MahaRERA counts where they differ.
Kanifnath Realtors: track record
From MahaRERA recordsKanifnath Realtors has 1 project in our MahaRERA register for Pune.
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Mohammadwadi
FAQ
What is the price of KP Supernova?
A local agent quotes ₹80 L for KP Supernova. Prices change often: ask for today's price and what it includes.
What is the possession date of KP Supernova?
The completion date filed with MahaRERA is 30 Apr 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of KP Supernova?
KP Supernova is registered with MahaRERA as PM1260002501030.
How many towers and floors does KP Supernova have?
MahaRERA lists 2 buildings, the tallest with 26 floors.
How many flats are there in KP Supernova?
MahaRERA lists 303 units (267 residential, 36 other).
How many homes in KP Supernova are booked?
59 of 303 homes were booked as per MahaRERA on 10 Nov 2026.
Who is the builder of KP Supernova?
The promoter registered with MahaRERA is Kanifnath Realtors.
Where is KP Supernova?
KP Supernova is in Mohammadwadi, Haveli, Pune district (pincode 411060).
Which school is nearest to KP Supernova?
Delhi Public School Pune, about 0.8 km away in a straight line from the map position; the drive is longer.
How far is KP Supernova from Magarpatta City?
About 5.4 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to KP Supernova.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 25 Mar 2026
- Dates and homes bookedFrom MahaRERA
Checked 11 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 10 Nov 2026
- Location and nearbyGathered and checked
Checked 11 Nov 2026
- DescriptionGathered and checked
Checked 11 Nov 2026
- PriceGathered and checked
The agent's price sheet (11 Nov 2026)
Get the price sheet and floor plans for KP SUPERNOVA
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.