Laxmi Empire, Ravet
See the site from above todayRavet, Haveli, Pune district · 412101
- Possession
- Apr 2027
- completion filed with MahaRERA
- Booked
- 248 of 385
- 11 booked in the last 30 days
What stands out
As of 15 Nov 2026, from MahaRERA and the sources below.
- 62% of homes booked: MahaRERA shows 237 of 385 homes booked.
- Buildings in this registration: 3, up to 19 floors.
- 62% booked here; the middle of 50 Ravet projects registered within a year of it is 65%.
- Compared with other projects still being built in Ravet: Compared with other projects still being built in Ravet: its tallest building is higher than that of 53 of 92.
- Completion date filed with MahaRERA: 30 Apr 2027.
Updated 21 Nov 2026
Price
No price for Laxmi Empire is published yet.
What new homes in Ravet usually ask
- 2 BHK about ₹60 – 85 L (47 projects)
- 2.5 BHK about ₹90 L – ₹1.1 Cr (3 projects)
- 3 BHK about ₹85 L – ₹1.2 Cr (51 projects)
- 4 BHK about ₹1.6 – 2 Cr (8 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Ravet, rounded. Use it to judge an offer, not as a price.
Ravet average ₹9,812/sq ft across 30 projectsThe middle asking price per sq ft of other projects in Ravet.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
Laxmi Empire from above, today
Laxmi Empire, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.
Nov 2022 Jan 2024 Feb 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Oct–Dec 2026 (looked Nov 2026)
Final structure outlines visible within the ring. Little change.
Registered with MahaRERA Dec 2022 · possession filed for Apr 2027
The ground around the project's map pin, seen by the Sentinel-2 satellite once each dry season from Jan 2021 to Oct 2026.
The seasons before
- Apr–May 2026Site activity continues around the structures. Little change.
- Jan–Mar 2026Building footprints fully formed with distinct shadows. Little change.
- Oct–Dec 2025Structure heights maintained with clear shadows. Little change.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2 (12 earlier seasons)
- Apr–May 2025Ongoing construction activity with established building outlines. Little change.
- Oct–Dec 2024Structures visible with defined shadows. Little change.
- Apr–May 2024Construction footprint maintained with slight structural changes. Little change.
- Oct–Dec 2023Initial structure footprints emerging with dark shadows cast to the northwest.
- Apr–May 2023Clearing continues with soil disturbance inside the ring. Little change.
- Jan–Mar 2023Ground clearing and early foundation activity visible. Little change.
- Oct–Dec 2022Work shows after the Dec 2022 registration, with bright ground patches.
- Apr–May 2022Dry soil visible in the ring area. Little change.
- Jan–Mar 2022Ground cleared with minimal plant cover. Little change.
- Oct–Dec 2021Sparse vegetation and ground cleared. Little change.
- Apr–May 2021Bare soil visible inside the ring. Little change.
- Jan–Mar 2021Bare land with little vegetation. Little change.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.
Flat sizes
- 1 BHK: 450 sq ft, carpet area
- 2 BHK: 767 to 844 sq ft, carpet area
Your agreement for sale states the final carpet area.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)7.7 km
- Baner-Balewadi High Street10.7 km
- Pune Airport (Lohegaon)19.9 km
- Pune Railway Station20.4 km
Nearby
- SchoolS.B. Patil Public School (SBPPS) Ravet, Pune1 km
- TempleISKCON (Shree Govinda Dham) Ravet1.7 km
- Railway stationDehu Road2.3 km
- ShoppingD Mart Ravet2.3 km
- CollegePimpri Chinchwad College Of Engineering (PCCOE)2.5 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
MahaRERA record
From MahaRERA, read 15 Nov 2026Possession date
30 Apr 2027
The completion date filed with MahaRERA is 30 Apr 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2026.
Laxmi Empire: what changed, as we read it
11 more homes booked between 16 Oct 2026 and 15 Nov 2026: 237 to 248, of 385 homes.
- 15 Nov 2026: 248 booked
- 16 Oct 2026: 237 booked
Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.
Beside other Ravet projects
Worked out by Avasetu- Homes booked
- 64%
- The middle of 51 Ravet projects registered within a year of it: 65%.
- Completion date
- Not moved by the builder
- 56 of 205 Ravet projects being built moved theirs 3 months or more.
From MahaRERA records read 15 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 248 of 385
- Towers
- 3 in this registration
- The tallest has 19 floors.
- Units
- 385
- 376 homes, 9 shops or offices.
- Registered on
- 1 Dec 2022
- MahaRERA registration
- P52100047887
- Listed or updated on MahaRERA 1 Dec 2022.
- Project type
- Residential / Group Housing
- Pincode
- 412101
Tower by tower
3 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| A | 19 | 126 | 9 |
| B | 19 | 188 | 0 |
| C | 19 | 62 | 0 |
As filed with MahaRERA (sanctioned floors).
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Ravet
FAQ
What is the price of Laxmi Empire?
No price for Laxmi Empire is published yet. Ask through the enquiry form on this page for the current price.
What is the possession date of Laxmi Empire?
The completion date filed with MahaRERA is 30 Apr 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of Laxmi Empire?
Laxmi Empire is registered with MahaRERA as P52100047887.
How many towers and floors does Laxmi Empire have?
MahaRERA lists 3 buildings, the tallest with 19 floors.
How many flats are there in Laxmi Empire?
MahaRERA lists 385 units (376 residential, 9 other).
How many homes in Laxmi Empire are booked?
248 of 385 homes were booked as per MahaRERA on 15 Nov 2026.
Where is Laxmi Empire?
Laxmi Empire is in Haveli, Pune district (pincode 412101).
Which school is nearest to Laxmi Empire?
S.B. Patil Public School (SBPPS) Ravet, Pune, about 1 km away in a straight line from the map position; the drive is longer.
Which railway station is nearest to Laxmi Empire?
Dehu Road, about 2.3 km away in a straight line from the map position; the drive is longer.
How far is Laxmi Empire from Pune Airport?
About 19.9 km in a straight line from the map position; the drive is longer.
How far is Laxmi Empire from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?
About 7.7 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Laxmi Empire.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 1 Dec 2022
- Dates and homes bookedFrom MahaRERA
Checked 10 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 10 Nov 2026
- Location and nearbyGathered and checked
Checked 10 Nov 2026
- DescriptionGathered and checked
Checked 10 Nov 2026
- Home sizesGathered and checked
The builder's site, or two property sites that agree