Skip to main contentSkip to navigation

NG Madhuban from space, 2021 to 2026

The ground around the project's map pin, seen by the Sentinel-2 satellite once each dry season from Jan 2021 to Oct 2026. Plants there were cleared between Jan 2024 and Jan 2025: the satellite's infrared shows plant cover falling from 48% to 26%.

Today, from Google satellite, centred on the same map pin.

44 clear months, Jan 2021 to Nov 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026New activity and structures visible near the ring for Phase II.
  2. Apr–May 2026Ground preparation visible near the ring for Phase II registration.
  3. Jan–Mar 2026Structures and shadows visible inside the ring ahead of Phase II.
  4. Oct–Dec 2025Ground cleared
  5. Apr–May 2025Little change in structure footprints and surrounding cleared ground.
  6. Jan–Mar 2025Clear building structures and shadows cast within the ring.
  7. Oct–Dec 2024Vegetation returns near the ring edges with established structures.
  8. Apr–May 2024Dry conditions with clear building footprints inside the ring.
  9. Jan–Mar 2024Building shadows and foundations visible within the ring area.
  10. Oct–Dec 2023Little change observed with ongoing construction activity footprints.
  11. Apr–May 2023Building footprints and cleared earth visible within the ring.
  12. Jan–Mar 2023New structures and shadows visible inside the ring indicating development.
  13. Oct–Dec 2022Ground disturbance visible inside the ring, work shows after registration.
  14. Apr–May 2022Ground cleared near the ring following the April 2022 registration.
  15. Jan–Mar 2022Plant cover remains visible inside the ring with slight variations.
  16. Oct–Dec 2021Green vegetation covers portions of the ring following monsoon rains.
  17. Apr–May 2021Dry ground and sparse vegetation visible inside the yellow ring.
  18. Jan–Mar 2021Vegetation and open land visible in ring, little change since before.

NG Madhuban: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.