Mahindra Rivenza from space, 2024 to 2026
Registered with MahaRERA in Oct 2026. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.
9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Initial ground clearing visible following the October 2026 registration.
- Apr–May 2026Dry and dusty open land with no structures.
- Jan–Mar 2026Ground cleared of vegetation, remaining bare.
- Oct–Dec 2025Seasonal vegetation returns sparsely around the ring.
- Apr–May 2025Dry soil conditions continue across the site.
- Jan–Mar 2025Bare ground cleared with minimal change observed.
- Oct–Dec 2024Vegetation regrows slightly across the open land.
- Apr–May 2024Dry earth with minor soil disturbances visible.
- Jan–Mar 2024Ground remains mostly bare and cleared.
Mahindra Rivenza: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.