Mangalam Melizma, Ravet
Sold as Kiwale by 7 property sites; we list it under Ravet (pincode 412101).
See the site from above todayby Ved Mangalam Associates · Ravet, Mawal, Pune district · 412101
- Homes
- 2, 3 BHK
- Price
- from ₹67.14 L
- EMI about ₹46,613 a month
- Possession
- Apr 2027
- completion filed with MahaRERA
- Booked
- 262 of 377
What stands out
As of 19 Nov 2026, from MahaRERA and the sources below.
- With 377 homes in this registration, it has more units than 181 of 199 under-construction developments in Ravet.
- 69% of homes booked: Buyers have taken 262 of the 377 units, while similar projects are at about 61%.
- Completion date 30 Apr 2027: MahaRERA's order added 4 months to the initial 31 Dec 2026 registration deadline.
- Two-bedroom flats range from 724 to 842 sq ft and start at ₹67 L, while three-bedroom units begin at ₹76 L.
Updated 21 Nov 2026
Price
2 BHK
From ₹67.14 L
Last checked 5 Nov 2026
All-in cost of the 2 BHK at ₹67.14 L: about ₹75.5 L
Price (agreement value) ₹67.14 L GST (5%) ₹3.36 L Stamp duty (7%) ₹4.7 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹75.5 L 3 BHK
From ₹76 L
Last checked 5 Nov 2026
All-in cost of the 3 BHK at ₹76 L: about ₹85.42 L
Price (agreement value) ₹76 L GST (5%) ₹3.8 L Stamp duty (7%) ₹5.32 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹85.42 L
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹46,613 a monthOn a ₹53.71 L loan (80% of ₹67.14 L) at 8.5% for 20 years. Ask your bank for its rate.
What new homes in Ravet usually ask
- 2 BHK about ₹60 – 85 L (46 projects)
- 2.5 BHK about ₹90 L – ₹1.1 Cr (3 projects)
- 3 BHK about ₹85 L – ₹1.2 Cr (50 projects)
- 4 BHK about ₹1.6 – 2 Cr (8 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Ravet, rounded. Use it to judge an offer, not as a price.
Ravet average ₹9,812/sq ft across 30 projectsThe middle asking price per sq ft of other projects in Ravet.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
Mangalam Melizma from above, today
Mangalam Melizma, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.
Nov 2022 Jan 2024 Feb 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Oct–Dec 2026 (looked Nov 2026)
Structures and casting shadows remain stable with ongoing site activity visible.
Registered with MahaRERA May 2023 · possession filed for Apr 2027
Mangalam Melizma in Kiwale was registered in May 2023. Initial satellite images show agricultural land and seasonal vegetation. Following registration, the ground was cleared and construction activity began, leading to visible building footprints and structural shadows in later years.
The seasons before
- Apr–May 2026Little change, established building footprints and shadows remain consistent through the season.
- Jan–Mar 2026Ground cleared
- Oct–Dec 2025Building shadows cast towards the north-west indicate ongoing superstructure work.
Construction proof from space: Jan 2022 to Oct 2026, Copernicus Sentinel-2 (11 earlier seasons)
- Apr–May 2025Little change, heavy structural shadows and footprints dominate the ring area.
- Jan–Mar 2025Tall building shadows lengthen further, confirming vertical construction activity after registration.
- Oct–Dec 2024Ground cleared
- Apr–May 2024Little change, active construction footprints remain visible with surrounding cleared land.
- Jan–Mar 2024New building footprints and bright construction highlights become visible inside the ring.
- Oct–Dec 2023Little change, ground remains cleared with minor structural footprints starting to emerge.
- Apr–May 2023Exposed ground and initial site preparation appear following the May 2023 registration.
- Jan–Mar 2023Ground clearing begins inside the ring as vegetation decreases ahead of registration.
- Oct–Dec 2022Seasonal greenery reappears across the fields and vacant land within the yellow ring.
- Apr–May 2022Dry earth persists inside the ring with no new structures or significant activity.
- Jan–Mar 2022Vegetation clears again revealing bare soil and regular agricultural patterns in the ring.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.
Flat sizes
- 2 BHK: 724 to 842 sq ft, carpet area
Your agreement for sale states the final carpet area.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)6.7 km
- Baner-Balewadi High Street10.3 km
- Pune Railway Station20.6 km
- Pune Airport (Lohegaon)20.7 km
Nearby
- SchoolS.B. Patil Public School (SBPPS) Ravet, Pune1.9 km
- TempleISKCON (Shree Govinda Dham) Ravet2.8 km
- ShoppingD Mart Ravet3.1 km
- CollegeD.Y. Patil College of Engineering3.3 km
- Railway stationDehu Road3.3 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
MahaRERA record
From MahaRERA, read 19 Nov 2026Possession date
30 Apr 2027
The completion date filed with MahaRERA is 30 Apr 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2026.
Beside other Ravet projects
Worked out by Avasetu- Homes booked
- 69%
- The middle of 61 Ravet projects registered within a year of it: 61%.
- Completion date
- Not moved by the builder
- 56 of 205 Ravet projects being built moved theirs 3 months or more.
From MahaRERA records read 19 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 262 of 377
- Towers
- 2 in this registration
- The tallest has 16 floors.
- Units
- 377
- 364 homes, 13 shops or offices.
- Registered on
- 29 May 2023
- MahaRERA registration
- P52100051095
- Listed or updated on MahaRERA 31 Aug 2026.
- Promoter (builder)
- Ved Mangalam Associates
- Project type
- Residential / Group Housing
- Pincode
- 412101
Tower by tower
2 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| Building A | 16 | 196 | 0 |
| Building B | 16 | 168 | 13 |
As filed with MahaRERA (sanctioned floors).
Ved Mangalam Associates: track record
From MahaRERA recordsVed Mangalam Associates has 1 project in our MahaRERA register for Pune.
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Ravet
- 108 Avyanapossession Apr 2027
- Aryaban3 BHK · from ₹90 L · possession Dec 2027Starts ₹23 L higher than Mangalam Melizma
- Aqua Life A Bldgpossession Oct 2027
- AshokVistas by Peninsula Landpossession Oct 2027
- Basil Flora2 BHK · from ₹67.91 L · possession Jul 2027About the same starting price as Mangalam Melizma
- Bhosale Empirepossession Dec 2027
FAQ
What is the price of Mangalam Melizma?
2 BHK: ₹67.14 L; 3 BHK: ₹76 L, checked on 5 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of Mangalam Melizma?
The completion date filed with MahaRERA is 30 Apr 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of Mangalam Melizma?
Mangalam Melizma is registered with MahaRERA as P52100051095.
How many towers and floors does Mangalam Melizma have?
MahaRERA lists 2 buildings, the tallest with 16 floors.
How many flats are there in Mangalam Melizma?
MahaRERA lists 377 units (364 residential, 13 other).
How many homes in Mangalam Melizma are booked?
262 of 377 homes were booked as per MahaRERA on 19 Nov 2026.
Who is the builder of Mangalam Melizma?
The promoter registered with MahaRERA is Ved Mangalam Associates.
Where is Mangalam Melizma?
Mangalam Melizma is in Mawal, Pune district (pincode 412101).
Which school is nearest to Mangalam Melizma?
S.B. Patil Public School (SBPPS) Ravet, Pune, about 1.9 km away in a straight line from the map position; the drive is longer.
Which railway station is nearest to Mangalam Melizma?
Dehu Road, about 3.3 km away in a straight line from the map position; the drive is longer.
How far is Mangalam Melizma from Pune Airport?
About 20.7 km in a straight line from the map position; the drive is longer.
How far is Mangalam Melizma from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?
About 6.7 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Mangalam Melizma.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 31 Aug 2026
- Dates and homes bookedFrom MahaRERA
Checked 5 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 5 Nov 2026
- Location and nearbyGathered and checked
Checked 5 Nov 2026
- DescriptionGathered and checked
Checked 5 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (5 Nov 2026)
- Home sizesGathered and checked
The builder's site, or two property sites that agree
- Project facts and amenitiesGathered and checked
The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (5 Nov 2026)