Skip to main contentSkip to navigation
MahaRERA registered PM1260002500728Verify on MahaRERA (opens in a new tab)Early stage

Mangalam Midas City, Moshi

Sold as Charholi by 9 property sites; we list it under Moshi (pincode 412105).

See the site from above today

by M/S. Mangalam Realty · Moshi, Haveli, Pune district · 412105

Homes
2, 3 BHK
Price
from ₹61.93 L
EMI about ₹42,995 a month
Possession
Apr 2031
completion filed with MahaRERA
Booked
226 of 386

What stands out

As of 12 Nov 2026, from MahaRERA and the sources below.

  • 59% booked here: Buyers have booked 226 of the 386 homes in this registration, while similar projects are at about 11%.
  • MahaRERA order added months: MahaRERA's order added 4 months to the completion date, which is the sole difference between the two filed dates.
  • Which part is being bought: Since this registration forms part of a bigger project, buyers should check which exact part they are purchasing.

Updated 21 Nov 2026

Price

  • 2 BHK

    From ₹61.93 L

    Last checked 8 Nov 2026

    All-in cost of the 2 BHK at ₹61.93 L: about ₹69.66 L
    Price (agreement value)₹61.93 L
    GST (5%)₹3.1 L
    Stamp duty (7%)₹4.34 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹69.66 L
  • 3 BHK

    From ₹64.9 L

    Last checked 8 Nov 2026

    All-in cost of the 3 BHK at ₹64.9 L: about ₹72.99 L
    Price (agreement value)₹64.9 L
    GST (5%)₹3.25 L
    Stamp duty (7%)₹4.54 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹72.99 L

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹42,995 a monthOn a ₹49.54 L loan (80% of ₹61.93 L) at 8.5% for 20 years. Ask your bank for its rate.

Rough price guide for Mangalam Midas City

  • 4 BHK about ₹90 L – ₹1.2 Cr

Our own rounded guide, checked against the area on 8 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.

What new homes in Moshi usually ask

  • 1 BHK about ₹30 – 45 L (11 projects)
  • 2 BHK about ₹45 – 65 L (53 projects)
  • 2.5 BHK about ₹65 – 80 L (4 projects)
  • 3 BHK about ₹65 – 90 L (40 projects)
  • 4 BHK about ₹1.1 – 2 Cr (5 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Moshi, rounded. Use it to judge an offer, not as a price.

Moshi average ₹7,638/sq ft across 18 projectsThe middle asking price per sq ft of other projects in Moshi.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Mangalam Midas City from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Mangalam Midas City, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Jan 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Mangalam Midas City from above, satellite picture of Nov 2022
    Nov 2022
  2. Mangalam Midas City from above, satellite picture of Jan 2024
    Jan 2024
  3. Mangalam Midas City from above, satellite picture of Jan 2025
    Jan 2025
  4. Mangalam Midas City from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Active construction footprints and shadows persist in the ring.

possession filed for Apr 2031

Month by month, Jan 2021 to Nov 2026: 42 clear months, October to May (the monsoon is under cloud).

Registered with MahaRERA in Sep 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

The seasons before

  1. Apr–May 2026Little change, structures and shadows remain within the ring.
  2. Jan–Mar 2026Building shadows lengthen, showing ongoing structural activity.
  3. Oct–Dec 2025Structure shadows indicate vertical growth following registration.
Construction proof from space: Jan 2021 to Nov 2026, Copernicus Sentinel-2 (13 earlier seasons)
  1. Apr–May 2025Little change, construction footprints remain visible in the ring.
  2. Jan–Mar 2025New building foundations and structures appear after registration.
  3. Oct–Dec 2024Initial foundation footprints and shadows emerge inside the ring.
  4. Apr–May 2024Little change, earthwork and open space fill the ring.
  5. Jan–Mar 2024Ground remains mostly cleared with very little plant cover.
  6. Oct–Dec 2023Sparse vegetation and cleared earth visible in the ring.
  7. Apr–May 2023Little change, cleared ground dominates the ring area.
  8. Jan–Mar 2023Plants decrease as ground clearing expands in the ring.
  9. Oct–Dec 2022Ground clearing begins to appear near the ring.
  10. Jan–Mar 2022Plant cover remains dense inside the ring area.
  11. Oct–Dec 2021Vegetation persists within the ring with little change observed.
  12. Apr–May 2021Little change, plants remain visible in the ring area.
  13. Jan–Mar 2021Ring shows dense plants and trees with no buildings present.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Pune Airport (Lohegaon)9.8 km
  • EON IT Park, Kharadi14.4 km
  • World Trade Center, Kharadi14.4 km
  • Baner-Balewadi High Street14.7 km

Nearby

  • TempleShree Gajanan Maharaj Sansthan1.8 km
  • CollegeMIT Arts, Commerce & Science College1.9 km
  • TempleShree Sai Devasthan2.2 km
  • CollegeMIT Alandi Campus2.3 km
  • TempleShree Sant Dnyaneshwar Maharaj Samadhi Mandir, Alandi2.8 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

MahaRERA record

From MahaRERA, read 12 Nov 2026

Possession date

30 Apr 2031

The completion date filed with MahaRERA is 30 Apr 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2030.

Beside other Moshi projects

Worked out by Avasetu
Homes booked
59%
The middle of 112 Moshi projects registered within a year of it: 13%.
Completion date
Not moved by the builder
62 of 290 Moshi projects being built moved theirs 3 months or more.

From MahaRERA records read 12 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
226 of 386
Towers
5 in this registration
The tallest has 23 floors. 7 in the whole project.
Units
386
373 homes, 13 shops or offices.
Registered on
9 Sep 2025
MahaRERA registration
PM1260002500728
Listed or updated on MahaRERA 2 Nov 2026.
Promoter (builder)
M/S. Mangalam Realty
Project type
Mixed
Pincode
412105

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Completion is filed for Apr 2031, about 4 years away. Until then you may pay rent and loan interest (pre-EMI) together; ask for a construction-linked payment plan.

Tower by tower

5 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
BUILDING A231550
BUILDING B231550
BUILDING E6317
BUILDING F6326
BUILDING G200

As filed with MahaRERA (sanctioned floors).

M/S. Mangalam Realty: track record

From MahaRERA records

M/S. Mangalam Realty has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Moshi

FAQ

What is the price of Mangalam Midas City?

2 BHK: ₹61.93 L; 3 BHK: ₹64.9 L, checked on 8 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Mangalam Midas City?

The completion date filed with MahaRERA is 30 Apr 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Mangalam Midas City?

Mangalam Midas City is registered with MahaRERA as PM1260002500728.

How many towers and floors does Mangalam Midas City have?

MahaRERA lists 5 buildings, the tallest with 23 floors.

How many flats are there in Mangalam Midas City?

MahaRERA lists 386 units (373 residential, 13 other).

How many homes in Mangalam Midas City are booked?

226 of 386 homes were booked as per MahaRERA on 12 Nov 2026.

Who is the builder of Mangalam Midas City?

The promoter registered with MahaRERA is M/S. Mangalam Realty.

Where is Mangalam Midas City?

Mangalam Midas City is in Haveli, Pune district (pincode 412105).

How far is Mangalam Midas City from Pune Airport?

About 9.8 km in a straight line from the map position; the drive is longer.

How far is Mangalam Midas City from EON IT Park, Kharadi?

About 14.4 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Mangalam Midas City.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 2 Nov 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 8 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 8 Nov 2026

  • Location and nearbyGathered and checked

    Checked 8 Nov 2026

  • DescriptionGathered and checked

    Checked 8 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (8 Nov 2026)

  • Rough price guideGathered and checked

    An asking price seen on one site, rounded and checked against the area (8 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (8 Nov 2026)

Get the price sheet and floor plans for MANGALAM MIDAS CITY

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment