Skip to main contentSkip to navigation

Goyal My Home Sanctuary Mamurdi from space, 2024 to 2026

Registered with MahaRERA in Mar 2026. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

Today, from Google satellite, centred on the same map pin.

9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Structures persist near the road with minor surrounding activity.
  2. Apr–May 2026Bright new footprints remain visible inside the ring.
  3. Jan–Mar 2026Work shows after the Mar 2026 registration with visible structures.
  4. Oct–Dec 2025Bright structures emerge inside the ring with surrounding clearing.
  5. Apr–May 2025Dry earth visible with slight construction activity outside the ring.
  6. Jan–Mar 2025Vegetation decreases and ground shows faint footprints.
  7. Oct–Dec 2024Monsoon vegetation appears within the ring area.
  8. Apr–May 2024Dry conditions persist with minimal change around the ring.
  9. Jan–Mar 2024Vegetation recedes, leaving bare ground and sparse patches.

Goyal My Home Sanctuary Mamurdi: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.