Skip to main contentSkip to navigation

Om Mangalam Samruddhi from space, 2024 to 2026

Registered with MahaRERA in Jul 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

Today, from Google satellite, centred on the same map pin.

9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Ground cleared
  2. Apr–May 2026Little change, established structures visible.
  3. Jan–Mar 2026Dense footprints and shadows inside ring.
  4. Oct–Dec 2025Buildings and shadows present, little change.
  5. Apr–May 2025Little change, permanent structures stand.
  6. Jan–Mar 2025Structures visible with tall building shadows.
  7. Oct–Dec 2024New building shadows cast in the ring.
  8. Apr–May 2024Little change, structures and shadows remain.
  9. Jan–Mar 2024Building footprints visible with dark shadows.

Om Mangalam Samruddhi: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.