Vilas Javdekar Palladio Presidential Suites Balewadi RiverFront from space, 2024 to 2026

Registered with MahaRERA in Mar 2026. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

Today, from Google satellite, centred on the same map pin.

9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Dense construction activity and new structures visible across the site.
  2. Apr–May 2026Clear layout with multiple building footprints established.
  3. Jan–Mar 2026Active construction footprints and material storage visible inside the ring.
  4. Oct–Dec 2025New structures and blue sheets appear as construction expands.
  5. Apr–May 2025Dry soil conditions surround the building footprint.
  6. Jan–Mar 2025Structure and cleared ground visible with reduced plant cover.
  7. Oct–Dec 2024Monsoon vegetation appears around the structure inside the ring.
  8. Apr–May 2024Dry earth and clear surroundings near the building footprint.
  9. Jan–Mar 2024Building structure remains visible amidst sparse vegetation.

Vilas Javdekar Palladio Presidential Suites Balewadi RiverFront: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.