Park Pebbles Phase I from space, 2024 to 2026
Registered with MahaRERA in Apr 2026. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.
9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Prominent building footprints cast distinct shadows northward within the ring.
- Apr–May 2026Building footprints defined inside the ring with extensive active site work around.
- Jan–Mar 2026Building footprints and dark shadows emerge inside the ring ahead of registration.
- Oct–Dec 2025Excavation and foundation footprints appear alongside new structures to the south.
- Apr–May 2025Widened access paths and distinct excavated ground plots visible inside the ring.
- Jan–Mar 2025Vegetation cleared from the circle; ground leveling expands to the east.
- Oct–Dec 2024Ground clearing begins around the curved track with adjacent cleared rectangular patches.
- Jan–Mar 2024Curved unpaved track through mostly open ground with sparse shrub cover.
Park Pebbles Phase I: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.