Skip to main contentSkip to navigation
Map: where Park West is
The project's position on the map
MahaRERA registered P52100055374Verify on MahaRERA (opens in a new tab)Mid stage

Park West, Ravet

See the site from above today

by Hapse Spaces · Ravet, Haveli, Pune district · 412101

Price
from ₹54.71 L
EMI about ₹37,983 a month
Possession
Apr 2029
completion filed with MahaRERA
Booked
252 of 338
14 booked in the last 30 days

Avasetu's read (from MahaRERA data, 13 Nov 2026)

This Ravet project has 252 of 338 homes booked, which is 75% compared to 43% for 66 similar projects. It added 14 bookings between 14 Oct 2026 and 13 Nov 2026. The completion date filed with MahaRERA is 30 Apr 2029.

What stands out

As of 13 Nov 2026, from MahaRERA and the sources below.

  • 75% of homes booked: MahaRERA shows 252 of 338 homes booked.
  • Buildings in this registration: 4, up to 28 floors.
  • 75% booked here; the middle of 66 Ravet projects registered within a year of it is 43%.
  • Compared with other projects still being built in Ravet: Compared with other projects still being built in Ravet: its tallest building is higher than that of 90 of 104.
  • Completion date filed with MahaRERA: 30 Apr 2029.

Updated 23 Nov 2026

Price

  • Homes

    ₹54.71 L – ₹83.38 L

    Last checked 21 Nov 2026

    All-in cost of a home at ₹54.71 L: about ₹61.58 L
    Price (agreement value)₹54.71 L
    GST (5%)₹2.74 L
    Stamp duty (7%)₹3.83 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹61.58 L

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹37,983 a monthOn a ₹43.77 L loan (80% of ₹54.71 L) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Ravet usually ask

  • 2 BHK about ₹60 – 85 L (47 projects)
  • 2.5 BHK about ₹90 L – ₹1.1 Cr (3 projects)
  • 3 BHK about ₹85 L – ₹1.2 Cr (51 projects)
  • 4 BHK about ₹1.6 – 2 Cr (8 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Ravet, rounded. Use it to judge an offer, not as a price.

Ravet average ₹9,812/sq ft across 30 projectsThe middle asking price per sq ft of other projects in Ravet.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Park West from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Park West, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Park West from above, satellite picture of Nov 2022
    Nov 2022
  2. Park West from above, satellite picture of Jan 2024
    Jan 2024
  3. Park West from above, satellite picture of Feb 2025
    Feb 2025
  4. Park West from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Construction activity continues with clear structural shadows.

Registered with MahaRERA Mar 2024 · possession filed for Apr 2029

Season by season, Jan 2023 to Oct 2026: 12 seasons, October to May (the monsoon is under cloud).

Park West shows transition from dense vegetation to active construction following its registration, with building footprints and shadows developing visibly over time.

The seasons before

  1. Apr–May 2026Little change, established building footprints visible.
  2. Jan–Mar 2026Prominent building shadows stretch across the site.
  3. Oct–Dec 2025Surrounding area densifies with more structures.
Construction proof from space: Jan 2023 to Oct 2026, Copernicus Sentinel-2 (8 earlier seasons)
  1. Apr–May 2025Little change, active construction footprint visible.
  2. Jan–Mar 2025Shadows grow longer, showing vertical development.
  3. Oct–Dec 2024Ground cleared
  4. Apr–May 2024Little change, earthworks continue.
  5. Jan–Mar 2024Foundations and early structural shadows appear.
  6. Oct–Dec 2023Ground remains mostly bare with slight green patches.
  7. Apr–May 2023Little change, bare soil persists.
  8. Jan–Mar 2023Sparse vegetation, cleared earth visible.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)8.2 km
  • Baner-Balewadi High Street11.4 km
  • Pune Airport (Lohegaon)20.9 km
  • Pune Railway Station21.3 km

Nearby

  • Railway stationDehu Road1.8 km
  • SchoolS.B. Patil Public School (SBPPS) Ravet, Pune1.9 km
  • TempleISKCON (Shree Govinda Dham) Ravet2.7 km
  • ShoppingD Mart Ravet3.3 km
  • CollegePimpri Chinchwad College Of Engineering (PCCOE)3.4 km

Straight-line distances; the drive is longer. Places: Google Maps.

Project facts

  • Available in 2 BHK, 3 BHK, and 4 BHK configurations.

Last checked 21 Nov 2026.

MahaRERA record

From MahaRERA, read 13 Nov 2026

Possession date

30 Apr 2029

The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2028.

Park West: what changed, as we read it

14 more homes booked between 14 Oct 2026 and 13 Nov 2026: 238 to 252, of 338 homes.

14 Oct 202613 Nov 2026
  • 13 Nov 2026: 252 booked
  • 14 Oct 2026: 238 booked

Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.

Beside other Ravet projects

Worked out by Avasetu
Homes booked
75%
The middle of 66 Ravet projects registered within a year of it: 43%.
Completion date
Not moved by the builder
56 of 205 Ravet projects being built moved theirs 3 months or more.

From MahaRERA records read 13 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
252 of 338
Towers
4 in this registration
The tallest has 28 floors.
Registered on
22 Mar 2024
MahaRERA registration
P52100055374
Listed or updated on MahaRERA 24 Dec 2024.
Promoter (builder)
Hapse Spaces
Project type
Residential / Group Housing
Pincode
412101

Open the MahaRERA record (opens in a new tab)

Tower by tower

4 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
PARK WEST C WING281280
PARK WEST D WING14240
PARK WEST A WING16580
PARK WEST B WING281280

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Land
2.5 acres

Last checked 21 Nov 2026. MahaRERA counts where they differ.

Hapse Spaces: track record

From MahaRERA records

Hapse Spaces has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Ravet

FAQ

What is the price of Park West?

Homes from ₹54.71 L to ₹83.38 L, checked on 21 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Park West?

The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Park West?

Park West is registered with MahaRERA as P52100055374.

How many towers and floors does Park West have?

MahaRERA lists 4 buildings, the tallest with 28 floors.

How many flats are there in Park West?

MahaRERA lists 338 units.

How many homes in Park West are booked?

252 of 338 homes were booked as per MahaRERA on 13 Nov 2026.

Who is the builder of Park West?

The promoter registered with MahaRERA is Hapse Spaces.

Where is Park West?

Park West is in 412101, Haveli, Pune district (pincode 412101).

Which school is nearest to Park West?

S.B. Patil Public School (SBPPS) Ravet, Pune, about 1.9 km away in a straight line from the map position; the drive is longer.

Which railway station is nearest to Park West?

Dehu Road, about 1.8 km away in a straight line from the map position; the drive is longer.

How far is Park West from Pune Airport?

About 20.9 km in a straight line from the map position; the drive is longer.

How far is Park West from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 8.2 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Park West.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 24 Dec 2024

  • Dates and homes bookedFrom MahaRERA

    Checked 21 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 9 Nov 2026

  • Location and nearbyGathered and checked

    Checked 21 Nov 2026

  • DescriptionGathered and checked

    Checked 21 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (21 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (21 Nov 2026)

Get the price sheet and floor plans for PARK WEST

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment