MahaRERA registered P52100046807Verify on MahaRERA (opens in a new tab)Mid stage

Presidential Towers, Ravet

See the site from above today

by Ceratec Construction · Ravet, Haveli, Pune district · 412101

Possession
Oct 2028
completion filed with MahaRERA
Booked
386 of 730

As of 20 Nov 2026, Presidential Towers by Ceratec Construction in Ravet, Pune district is registered with MahaRERA as P52100046807. The completion date filed with MahaRERA is 30 Oct 2028, moved from 31 Dec 2027 at registration (MahaRERA's August 2026 order added 4 months to most projects). MahaRERA shows 386 of 730 homes booked. That is 53% booked, against 66% for the middle of 40 Ravet projects registered within a year of it.

Updated 21 Nov 2026

Our team is still collecting details on Presidential Towers.

We do not have prices, the builder's pictures and floor plans yet. What you see here is what we have now: MahaRERA's record, read on the date shown. Ask us and we send you what we find first.

Ask for the detailsOther new projects we are reading

Price

No price for Presidential Towers is published yet.

What new homes in Ravet usually ask

  • 2 BHK about ₹60 – 85 L (47 projects)
  • 2.5 BHK about ₹90 L – ₹1.1 Cr (3 projects)
  • 3 BHK about ₹85 L – ₹1.2 Cr (51 projects)
  • 4 BHK about ₹1.6 – 2 Cr (8 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Ravet, rounded. Use it to judge an offer, not as a price.

Ravet average ₹9,812/sq ft across 30 projectsThe middle asking price per sq ft of other projects in Ravet.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Presidential Towers from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Presidential Towers, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Presidential Towers from above, satellite picture of Nov 2022
    Nov 2022
  2. Presidential Towers from above, satellite picture of Jan 2024
    Jan 2024
  3. Presidential Towers from above, satellite picture of Feb 2025
    Feb 2025
  4. Presidential Towers from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Ground cleared

Registered with MahaRERA Sep 2022 · possession filed for Oct 2028

Season by season, Jan 2021 to Oct 2026: 18 seasons, October to May (the monsoon is under cloud).

Presidential Towers in Pune, registered in September 2022, shows active construction following its registration. Ground clearing began early on, followed by the appearance of tall building shadows indicating significant vertical development through 2023 to 2026.

The seasons before

  1. Apr–May 2026Little change observed in ground features.
  2. Jan–Mar 2026Shadows from tall towers remain visible inside the ring.
  3. Oct–Dec 2025Little change, site conditions remain stable.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2 (14 earlier seasons)
  1. Apr–May 2025Little change, established structures maintain their footprint.
  2. Jan–Mar 2025Tall building shadows persist inside the ring area.
  3. Oct–Dec 2024Little change in structure footprints and surrounding ground.
  4. Apr–May 2024Clear structure footprints and shadows visible.
  5. Jan–Mar 2024Prominent dark shadows cast by tall structures inside the ring.
  6. Oct–Dec 2023Building shadows lengthen, indicating vertical growth.
  7. Apr–May 2023Little change, structures and shadows remain consistent.
  8. Jan–Mar 2023Ground cleared
  9. Oct–Dec 2022Work begins after Sep 2022 registration with initial footprint changes.
  10. Apr–May 2022Bare earth visible inside the ring, little change.
  11. Jan–Mar 2022Plant cover reduced to zero, ground cleared inside ring.
  12. Oct–Dec 2021Little change, ground remains largely unaltered.
  13. Apr–May 2021Dry ground visible inside the ring with sparse vegetation.
  14. Jan–Mar 2021Vegetation visible inside ring, little change since prior periods.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)6.7 km
  • Baner-Balewadi High Street10 km
  • Pune Airport (Lohegaon)19.9 km
  • Pune Railway Station20 km

Nearby

  • SchoolS.B. Patil Public School (SBPPS) Ravet, Pune1 km
  • TempleISKCON (Shree Govinda Dham) Ravet2 km
  • ShoppingD Mart Ravet2.2 km
  • CollegeD. Y. Patil International University2.5 km
  • CollegeD.Y. Patil College of Engineering2.5 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

MahaRERA record

From MahaRERA, read 20 Nov 2026

Possession date

30 Oct 2028

Completion date filed with MahaRERA. At registration: 31 Dec 2027. Moved 6 months later, 4 of them by MahaRERA's August 2026 order for most projects.

Ask for the possession date in writing in your agreement for sale.

Beside other Ravet projects

Worked out by Avasetu
Homes booked
53%
The middle of 40 Ravet projects registered within a year of it: 66%.
Completion date
Moved 6 months later
55 of 205 Ravet projects being built moved theirs 3 months or more.

From MahaRERA records read 20 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
386 of 730
Towers
4 in this registration
The tallest has 39 floors.
Registered on
10 Sep 2022
MahaRERA registration
P52100046807
Listed or updated on MahaRERA 14 Aug 2026.
Promoter (builder)
Ceratec Construction
Project type
Residential / Group Housing
Pincode
412101

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • The builder has moved the completion date 6 months later since registration, from Dec 2027 to Oct 2028 (MahaRERA's 2026 blanket extension for all projects left out). Ask why, and which date goes in your agreement for sale.
  • Towers go up to 39 floors. Ask how many lifts serve your tower and how many homes share them.

Tower by tower

9 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
Presidential Towers392680
Presidential Towers342320
Presidential Towers322240
Presidential Towers410
Presidential Towers410
Presidential Towers410
Presidential Towers410
Presidential Towers410
Presidential Towers410

As filed with MahaRERA (sanctioned floors).

Ceratec Construction: track record

From MahaRERA records

Ceratec Construction has 2 projects in our MahaRERA register for Pune.

All 2 projects by Ceratec Construction in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Ravet

More by Ceratec Construction

FAQ

What is the price of Presidential Towers?

No price for Presidential Towers is published yet. Ask through the enquiry form on this page for the current price.

What is the possession date of Presidential Towers?

The completion date filed with MahaRERA is 30 Oct 2028. At registration it was 31 Dec 2027. MahaRERA added 4 months to most projects' dates in August 2026 (Order 66/2026). Ask the builder for the possession date in your agreement, in writing.

What is the MahaRERA number of Presidential Towers?

Presidential Towers is registered with MahaRERA as P52100046807.

How many towers and floors does Presidential Towers have?

MahaRERA lists 4 buildings, the tallest with 39 floors.

How many flats are there in Presidential Towers?

MahaRERA lists 730 units.

How many homes in Presidential Towers are booked?

386 of 730 homes were booked as per MahaRERA on 20 Nov 2026.

Who is the builder of Presidential Towers?

The promoter registered with MahaRERA is Ceratec Construction. Our register has 2 Pune projects by Ceratec Construction.

Where is Presidential Towers?

Presidential Towers is in Haveli, Pune district (pincode 412101).

Which school is nearest to Presidential Towers?

S.B. Patil Public School (SBPPS) Ravet, Pune, about 1 km away in a straight line from the map position; the drive is longer.

How far is Presidential Towers from Pune Airport?

About 19.9 km in a straight line from the map position; the drive is longer.

How far is Presidential Towers from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 6.7 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Presidential Towers.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 14 Aug 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 19 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 19 Nov 2026

  • Location and nearbyGathered and checked

    Checked 19 Nov 2026

  • DescriptionNot checked yet

    Still checking

Get the price sheet and floor plans for Presidential Towers

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment