
Prismcity- Skylife, Moshi
Sold as Charholi by 7 property sites; we list it under Moshi (pincode 412105).
See the site from above todayby Swastik Diamond Developers · Moshi, Haveli, Pune district · 412105
- Homes
- 2, 3 BHK
- Price
- from ₹56.2 L
- EMI about ₹39,017 a month
- Possession
- Apr 2028
- completion filed with MahaRERA
- Booked
- 277 of 358
- 45 booked in the last 30 days
Avasetu's read (from MahaRERA data, 19 Nov 2026)
With 277 of 358 homes booked, this project stands at 77%, while 123 similar Moshi projects are at about 30%. Sales added 45 more homes between 20 Oct 2026 and 19 Nov 2026. The completion date filed with MahaRERA is 30 Apr 2028.
What stands out
As of 19 Nov 2026, from MahaRERA and the sources below.
- 77% of homes booked: Buyers have reserved 277 of the 358 homes, while similar projects are at about 30%.
- The project includes 358 homes across two buildings, giving it a larger scale than 242 of 269 local registrations.
- The registration targets completion on 30 Apr 2028. MahaRERA's order added the months from the initial 31 Dec 2027 date.
Updated 21 Nov 2026
Price
2 BHK
₹56.2 L – ₹75.2 L
from 799 sq ft · ₹7,034/sq ft
Last checked 21 Nov 2026
All-in cost of the 2 BHK at ₹56.2 L: about ₹63.24 L
Price (agreement value) ₹56.2 L GST (5%) ₹2.81 L Stamp duty (7%) ₹3.93 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹63.24 L 3 BHK
₹79.24 L – ₹1.21 Cr
from 1,265 sq ft · ₹6,264/sq ft
Last checked 21 Nov 2026
All-in cost of the 3 BHK at ₹79.24 L: about ₹89.05 L
Price (agreement value) ₹79.24 L GST (5%) ₹3.96 L Stamp duty (7%) ₹5.55 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹89.05 L
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹39,017 a monthOn a ₹44.96 L loan (80% of ₹56.2 L) at 8.5% for 20 years. Ask your bank for its rate.
What new homes in Moshi usually ask
- 1 BHK about ₹30 – 45 L (11 projects)
- 2 BHK about ₹45 – 65 L (53 projects)
- 2.5 BHK about ₹65 – 80 L (4 projects)
- 3 BHK about ₹65 – 90 L (40 projects)
- 4 BHK about ₹1.1 – 1.9 Cr (6 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Moshi, rounded. Use it to judge an offer, not as a price.
Moshi average ₹7,639/sq ft across 17 projectsThe middle asking price per sq ft of other projects in Moshi.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
Prismcity- Skylife from above, today
Prismcity- Skylife, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Jan 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.
Nov 2022 Jan 2024 Jan 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Oct–Dec 2026 (looked Nov 2026)
Defined building footprints and shadows visible inside the ring.
possession filed for Apr 2028
The site starts as undeveloped land with seasonal vegetation. Ground clearing begins around late 2022. Following the November 2024 registration, clear construction activity, building footprints, and structural shadows emerge within the ring through 2025 and 2026.
The seasons before
- Apr–May 2026Active construction footprints and shadows persist; little change.
- Jan–Mar 2026Ground cleared
- Oct–Dec 2025Building footprints become more defined with emerging structural shadows.
Construction proof from space: Jan 2021 to Nov 2026, Copernicus Sentinel-2 (13 earlier seasons)
- Apr–May 2025Continued construction activity and structure footprints visible.
- Jan–Mar 2025Early foundation work and shadows of structures appear in the ring.
- Oct–Dec 2024Work shows after the Nov 2024 registration with new ground activity.
- Apr–May 2024Bare soil and disturbed earth visible; little change.
- Jan–Mar 2024Minimal vegetation and cleared ground visible inside the ring.
- Oct–Dec 2023Groundwork and clearing persist inside the ring; little change.
- Apr–May 2023Exposed earth and ground clearing continue; little change.
- Jan–Mar 2023Sparse vegetation and disturbed soil visible inside the ring.
- Oct–Dec 2022Ground clearing and early site preparation visible inside the ring.
- Jan–Mar 2022Ground remains largely unchanged with minor vegetation cover; little change.
- Oct–Dec 2021Vegetation regrows slightly within the ring; little change observed.
- Apr–May 2021Dry soil and sparse vegetation visible inside the ring; little change.
- Jan–Mar 2021Undeveloped land and vegetation visible inside the ring; little change from before.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- Pune Airport (Lohegaon)8.6 km
- EON IT Park, Kharadi12.5 km
- World Trade Center, Kharadi12.6 km
- Pune Railway Station14.5 km
Nearby
- TempleWagheshwar Maharaj Temple0.5 km
- BankAxis Bank1.4 km
- TempleShree Gajanan Maharaj Sansthan2.2 km
- CollegeMIT Alandi Campus2.3 km
- CollegeMIT Arts, Commerce & Science College2.3 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
MahaRERA record
From MahaRERA, read 19 Nov 2026Possession date
30 Apr 2028
The completion date filed with MahaRERA is 30 Apr 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2027.
Prismcity- Skylife: what changed, as we read it
45 more homes booked between 20 Oct 2026 and 19 Nov 2026: 232 to 277, of 358 homes.
- 19 Nov 2026: 277 booked
- 20 Oct 2026: 232 booked
Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.
Beside other Moshi projects
Worked out by Avasetu- Homes booked
- 77%
- The middle of 123 Moshi projects registered within a year of it: 30%.
- Completion date
- Not moved by the builder
- 62 of 290 Moshi projects being built moved theirs 3 months or more.
From MahaRERA records read 19 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 277 of 358
- Towers
- 2 in this registration
- The tallest has 24 floors.
- Units
- 358
- 319 homes, 39 shops or offices.
- Registered on
- 29 Nov 2024
- MahaRERA registration
- P52100078248
- Listed or updated on MahaRERA 29 Nov 2024.
- Promoter (builder)
- Swastik Diamond Developers
- Project type
- Others
- Pincode
- 412105
Check before you book
From MahaRERA and checked sites- About 173 homes per acre (358 homes on 2.07 acres, from two property sites that agree). Towers stand close: ask how far your tower is from the next and which flats face another tower.
- 39 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.
Tower by tower
2 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| BUILDING - A | 24 | 319 | 0 |
| Commercial | 5 | 0 | 39 |
As filed with MahaRERA (sanctioned floors).
What the builder's and property sites say
Gathered and checked- Floors per tower (highest)
- up to 21 floors
- Land
- 2.07 acres
Last checked 21 Nov 2026. MahaRERA counts where they differ.
Swastik Diamond Developers: track record
From MahaRERA recordsSwastik Diamond Developers has 1 project in our MahaRERA register for Pune.
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Moshi
FAQ
What is the price of Prismcity- Skylife?
2 BHK: ₹56.2 L to ₹75.2 L; 3 BHK: ₹79.24 L to ₹1.21 Cr, checked on 21 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of Prismcity- Skylife?
The completion date filed with MahaRERA is 30 Apr 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of Prismcity- Skylife?
Prismcity- Skylife is registered with MahaRERA as P52100078248.
How many towers and floors does Prismcity- Skylife have?
MahaRERA lists 2 buildings, the tallest with 24 floors.
How many flats are there in Prismcity- Skylife?
MahaRERA lists 358 units (319 residential, 39 other).
How many homes in Prismcity- Skylife are booked?
277 of 358 homes were booked as per MahaRERA on 19 Nov 2026.
Who is the builder of Prismcity- Skylife?
The promoter registered with MahaRERA is Swastik Diamond Developers.
Where is Prismcity- Skylife?
Prismcity- Skylife is in 412105, Haveli, Pune district (pincode 412105).
How far is Prismcity- Skylife from Pune Airport?
About 8.6 km in a straight line from the map position; the drive is longer.
How far is Prismcity- Skylife from EON IT Park, Kharadi?
About 12.5 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Prismcity- Skylife.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 29 Nov 2024
- Dates and homes bookedFrom MahaRERA
Checked 21 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 8 Nov 2026
- Location and nearbyGathered and checked
Checked 21 Nov 2026
- DescriptionGathered and checked
Checked 21 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (21 Nov 2026)
Get the price sheet and floor plans for PRISMCITY- SKYLIFE
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.