RADHE ANANTAM Charholi from space, 2021 to 2026
Registered with MahaRERA in Mar 2026. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.
43 clear months, Jan 2021 to Nov 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Work shows after the Oct 2026 registration.
- Jan–Mar 2026Work shows after the Mar 2026 registration.
- Oct–Dec 2025Roads taking shape near the ring.
- Jan–Mar 2025New building footprints visible in the ring.
- Oct–Dec 2024Bright structures appear inside the ring.
- Jan–Mar 2024Ground cleared inside the ring.
- Oct–Dec 2023A water pool appears near the ring.
- Jan–Mar 2023Ground cleared inside the ring.
- Oct–Dec 2022Dark patches appear inside the ring.
- Jan–Mar 2022Little change in the ring.
- Jan–Mar 2021Barren land inside the ring with sparse plants.
RADHE ANANTAM Charholi: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.