Skip to main contentSkip to navigation

RADHE ANANTAM Charholi from space, 2021 to 2026

Registered with MahaRERA in Mar 2026. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

Today, from Google satellite, centred on the same map pin.

43 clear months, Jan 2021 to Nov 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Work shows after the Oct 2026 registration.
  2. Jan–Mar 2026Work shows after the Mar 2026 registration.
  3. Oct–Dec 2025Roads taking shape near the ring.
  4. Jan–Mar 2025New building footprints visible in the ring.
  5. Oct–Dec 2024Bright structures appear inside the ring.
  6. Jan–Mar 2024Ground cleared inside the ring.
  7. Oct–Dec 2023A water pool appears near the ring.
  8. Jan–Mar 2023Ground cleared inside the ring.
  9. Oct–Dec 2022Dark patches appear inside the ring.
  10. Jan–Mar 2022Little change in the ring.
  11. Jan–Mar 2021Barren land inside the ring with sparse plants.

RADHE ANANTAM Charholi: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.