Skip to main contentSkip to navigation

Raheja Vistas - T1 & T2 from space, 2024 to 2026

Registered with MahaRERA in Nov 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

Today, from Google satellite, centred on the same map pin.

9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Active building footprints and shadows visible near the ring.
  2. Apr–May 2026Construction structures present inside and around the ring.
  3. Jan–Mar 2026Building shadows and structures visible in and near the ring.
  4. Oct–Dec 2025New structures appear near the ring boundary after registration.
  5. Apr–May 2025Dry land inside the ring, little change overall.
  6. Jan–Mar 2025Bare soil inside the ring, minimal activity seen.
  7. Oct–Dec 2024Open ground inside the ring, little change since last season.
  8. Apr–May 2024Dry earth within the ring, little change observed.
  9. Jan–Mar 2024Bare ground inside the ring, minimal vegetation visible.

Raheja Vistas - T1 & T2: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.