Raheja Vistas - T1 & T2 from space, 2024 to 2026
Registered with MahaRERA in Nov 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.
9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Active building footprints and shadows visible near the ring.
- Apr–May 2026Construction structures present inside and around the ring.
- Jan–Mar 2026Building shadows and structures visible in and near the ring.
- Oct–Dec 2025New structures appear near the ring boundary after registration.
- Apr–May 2025Dry land inside the ring, little change overall.
- Jan–Mar 2025Bare soil inside the ring, minimal activity seen.
- Oct–Dec 2024Open ground inside the ring, little change since last season.
- Apr–May 2024Dry earth within the ring, little change observed.
- Jan–Mar 2024Bare ground inside the ring, minimal vegetation visible.
Raheja Vistas - T1 & T2: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.