Skip to main contentSkip to navigation

RGS Forte Aspire from space, 2024 to 2026

Registered with MahaRERA in Jan 2026. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

Today, from Google satellite, centred on the same map pin.

9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026New structures and blue protective sheets occupy the ring.
  2. Apr–May 2026Ground cleared
  3. Jan–Mar 2026Work shows after the Jan 2026 registration with tall footprints.
  4. Oct–Dec 2025Structure foundations and material storage cover the ring area.
  5. Apr–May 2025Active construction continues with bright reflective structures visible.
  6. Jan–Mar 2025Ground cleared
  7. Oct–Dec 2024Early construction footprints and bright blue sheets appear.
  8. Apr–May 2024Dry earth and cleared plots fill the entire ring.
  9. Jan–Mar 2024Little change, bare ground and sparse green patches remain.

RGS Forte Aspire: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.