Skip to main contentSkip to navigation

Rohan Ekam: Balewadi from space, 2021 to 2026

The ground around the project's map pin, seen by the Sentinel-2 satellite once each dry season from Jan 2021 to Oct 2026. Plants there were cleared between Jan 2023 and Jan 2024: the satellite's infrared shows plant cover falling from 26% to 22%.

Today, from Google satellite, centred on the same map pin.

42 clear months, Jan 2021 to Nov 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Dense shadows from multiple structures cover portions of the ring area.
  2. Apr–May 2026Construction activity maintains prominent building footprints and shadows.
  3. Jan–Mar 2026Work aligns with Phase 2 and Phase 3 registrations, showing dense shadows.
  4. Oct–Dec 2025Ground cleared
  5. Apr–May 2025Structure outlines and shadows remain visible within the active construction zone.
  6. Jan–Mar 2025Ground cleared
  7. Oct–Dec 2024Initial foundation structures and shadows from early building work emerge.
  8. Apr–May 2024Bare soil and structured excavation pits are visible within the ring.
  9. Jan–Mar 2024Excavation deepens and earthmoving activity expands across the ring.
  10. Oct–Dec 2023Work shows after the Aug 2022 registration with early excavation footprints appearing.
  11. Apr–May 2023Bare earth and disturbed ground are visible across the ring.
  12. Jan–Mar 2023Ground clearance continues in and around the ring area.
  13. Oct–Dec 2022New clearing activity begins just outside the ring to the north.
  14. Jan–Mar 2022Vegetation persists in patches within the ring with bare ground visible.
  15. Oct–Dec 2021Green vegetation cover appears across the ring following the monsoon season.
  16. Apr–May 2021Dry soil and sparse vegetation within the ring, showing little change.
  17. Jan–Mar 2021Empty ground with sparse vegetation inside the ring, showing little change from previous periods.

Rohan Ekam: Balewadi: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.