Skip to main contentSkip to navigation
MahaRERA registered P52100055867Verify on MahaRERA (opens in a new tab)Mid stage

Sankalp Hilife, Moshi

Sold as Charholi by 6 property sites; we list it under Moshi (pincode 412105).

See the site from above today

by Sankalp Developers · Moshi, Haveli, Pune district · 412105

Price
from ₹42.64 L
EMI about ₹29,603 a month
Possession
Apr 2028
completion filed with MahaRERA
Booked
392 of 511

What stands out

As of 13 Nov 2026, from MahaRERA and the sources below.

  • 77% of homes booked: MahaRERA shows 392 of 511 homes booked.
  • Buildings in this registration: 3, up to 15 floors.
  • 77% booked here; the middle of 112 Moshi projects registered within a year of it is 50%.
  • Compared with other projects still being built in Moshi: Compared with other projects still being built in Moshi: its tallest building is higher than that of 30 of 123.
  • Completion date filed with MahaRERA: 30 Apr 2028.

Updated 21 Nov 2026

Price

  • Homes

    ₹42.64 L – ₹1.13 Cr

    Last checked 20 Nov 2026

    All-in cost of a home at ₹42.64 L: about ₹48.06 L
    Price (agreement value)₹42.64 L
    GST (5%)₹2.13 L
    Stamp duty (7%)₹2.98 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹48.06 L

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹29,603 a monthOn a ₹34.11 L loan (80% of ₹42.64 L) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Moshi usually ask

  • 1 BHK about ₹30 – 45 L (11 projects)
  • 2 BHK about ₹45 – 65 L (54 projects)
  • 2.5 BHK about ₹65 – 80 L (4 projects)
  • 3 BHK about ₹65 – 90 L (41 projects)
  • 4 BHK about ₹1.1 – 1.9 Cr (6 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Moshi, rounded. Use it to judge an offer, not as a price.

Moshi average ₹7,638/sq ft across 18 projectsThe middle asking price per sq ft of other projects in Moshi.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Sankalp Hilife from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Sankalp Hilife, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Jan 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Sankalp Hilife from above, satellite picture of Nov 2022
    Nov 2022
  2. Sankalp Hilife from above, satellite picture of Jan 2024
    Jan 2024
  3. Sankalp Hilife from above, satellite picture of Jan 2025
    Jan 2025
  4. Sankalp Hilife from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Little change since the previous season.

possession filed for Apr 2028

Month by month, Jan 2021 to Nov 2026: 43 clear months, October to May (the monsoon is under cloud).

The ground around the project's map pin, seen by the Sentinel-2 satellite once each dry season from Jan 2021 to Oct 2026. Plants there were cleared between Jan 2022 and Jan 2023: the satellite's infrared shows plant cover falling from 50% to 28%.

The seasons before

  1. Apr–May 2026Little change since the previous season.
  2. Jan–Mar 2026Building structures are clearly visible with shadows cast to the northwest.
  3. Oct–Dec 2025Little change since the previous season.
Construction proof from space: Jan 2021 to Nov 2026, Copernicus Sentinel-2 (14 earlier seasons)
  1. Apr–May 2025Little change since the previous season.
  2. Jan–Mar 2025Ground cleared
  3. Oct–Dec 2024New building foundations and structures emerge inside and just outside the ring.
  4. Apr–May 2024Little change since the previous season.
  5. Jan–Mar 2024Ground clearing and early site activity appear after the April 2024 registration.
  6. Oct–Dec 2023Little change since the previous season.
  7. Apr–May 2023Little change since the previous season.
  8. Jan–Mar 2023Reduced vegetation cover inside the ring compared to previous years.
  9. Oct–Dec 2022Little change since the previous season.
  10. Apr–May 2022Little change since the previous season.
  11. Jan–Mar 2022Little change since the previous season with similar vegetation cover.
  12. Oct–Dec 2021Little change since the previous season.
  13. Apr–May 2021Little change since the previous season.
  14. Jan–Mar 2021Vegetated land and dirt roads are visible inside the ring; little change overall.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Pune Airport (Lohegaon)7.8 km
  • EON IT Park, Kharadi12.3 km
  • World Trade Center, Kharadi12.3 km
  • Pune Railway Station13.2 km

Nearby

  • TempleShree Sai Devasthan1.4 km
  • TempleWagheshwar Maharaj Temple1.9 km
  • TempleShree Gajanan Maharaj Sansthan2.7 km
  • CollegeMIT Arts, Commerce & Science College2.9 km
  • CollegeMIT Alandi Campus3.1 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Project facts

  • Available configurations include 2, 2.5, and 4 BHK units.

Amenities

  • Covered parking facilities are available.

Last checked 20 Nov 2026.

MahaRERA record

From MahaRERA, read 13 Nov 2026

Possession date

30 Apr 2028

The completion date filed with MahaRERA is 30 Apr 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2027.

Beside other Moshi projects

Worked out by Avasetu
Homes booked
77%
The middle of 112 Moshi projects registered within a year of it: 50%.
Completion date
Not moved by the builder
62 of 290 Moshi projects being built moved theirs 3 months or more.

From MahaRERA records read 13 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
392 of 511
Towers
3 in this registration
The tallest has 15 floors.
Units
511
493 homes, 18 shops or offices.
Registered on
23 Apr 2024
MahaRERA registration
P52100055867
Listed or updated on MahaRERA 12 Aug 2024.
Promoter (builder)
Sankalp Developers
Project type
Others
Pincode
412105

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA and checked sites
  • About 170 homes per acre (511 homes on 3 acres, from two property sites that agree). Towers stand close: ask how far your tower is from the next and which flats face another tower.

Tower by tower

3 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
BUILDING A1523318
BUILDING B151060
WING C151540

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Land
3 acres

Last checked 20 Nov 2026. MahaRERA counts where they differ.

Sankalp Developers: track record

From MahaRERA records

Sankalp Developers has 3 projects in our MahaRERA register for Pune.

All 3 projects by Sankalp Developers in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Moshi

More by Sankalp Developers

FAQ

What is the price of Sankalp Hilife?

Homes from ₹42.64 L to ₹1.13 Cr, checked on 20 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Sankalp Hilife?

The completion date filed with MahaRERA is 30 Apr 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Sankalp Hilife?

Sankalp Hilife is registered with MahaRERA as P52100055867.

How many towers and floors does Sankalp Hilife have?

MahaRERA lists 3 buildings, the tallest with 15 floors.

How many flats are there in Sankalp Hilife?

MahaRERA lists 511 units (493 residential, 18 other).

How many homes in Sankalp Hilife are booked?

392 of 511 homes were booked as per MahaRERA on 13 Nov 2026.

Who is the builder of Sankalp Hilife?

The promoter registered with MahaRERA is Sankalp Developers. Our register has 3 Pune projects by Sankalp Developers.

Where is Sankalp Hilife?

Sankalp Hilife is in 412105, Haveli, Pune district (pincode 412105).

How far is Sankalp Hilife from Pune Airport?

About 7.8 km in a straight line from the map position; the drive is longer.

How far is Sankalp Hilife from EON IT Park, Kharadi?

About 12.3 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Sankalp Hilife.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 12 Aug 2024

  • Dates and homes bookedFrom MahaRERA

    Checked 20 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 9 Nov 2026

  • Location and nearbyGathered and checked

    Checked 20 Nov 2026

  • DescriptionGathered and checked

    Checked 20 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (20 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (20 Nov 2026)

Get the price sheet and floor plans for SANKALP HILIFE

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment