Skip to main contentSkip to navigation
MahaRERA registered P52100079020Verify on MahaRERA (opens in a new tab)Mid stage

Sankalp Sierra, Moshi

Sold as Charholi by 3 property sites; we list it under Moshi (pincode 412105).

See the site from above today

by Sankalp Properties · Moshi, Haveli, Pune district · 412105

Possession
Apr 2029
completion filed with MahaRERA
Booked
115 of 343

What stands out

As of 20 Nov 2026, from MahaRERA and the sources below.

  • 34% of homes booked: MahaRERA shows 115 of 343 homes booked.
  • Buildings in this registration: 2, up to 29 floors.
  • 34% booked here; the middle of 114 Moshi projects registered within a year of it is 25%.
  • Compared with other projects still being built in Moshi: Compared with other projects still being built in Moshi: its tallest building is higher than that of 42 of 46.
  • Completion date filed with MahaRERA: 30 Apr 2029.

Updated 21 Nov 2026

Price

Rough price guide for Sankalp Sierra

  • 3 BHK about ₹85 L – ₹1.3 Cr

Our own rounded guide, checked against the area on 8 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.

What new homes in Moshi usually ask

  • 1 BHK about ₹30 – 45 L (11 projects)
  • 2 BHK about ₹45 – 65 L (54 projects)
  • 2.5 BHK about ₹65 – 80 L (4 projects)
  • 3 BHK about ₹65 – 90 L (40 projects)
  • 4 BHK about ₹1.1 – 1.9 Cr (6 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Moshi, rounded. Use it to judge an offer, not as a price.

Moshi average ₹7,638/sq ft across 18 projectsThe middle asking price per sq ft of other projects in Moshi.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Sankalp Sierra from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Sankalp Sierra, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Jan 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Sankalp Sierra from above, satellite picture of Nov 2022
    Nov 2022
  2. Sankalp Sierra from above, satellite picture of Jan 2024
    Jan 2024
  3. Sankalp Sierra from above, satellite picture of Jan 2025
    Jan 2025
  4. Sankalp Sierra from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Sparse vegetation and cleared earth visible inside the ring.

possession filed for Apr 2029

Month by month, Jan 2021 to Nov 2026: 43 clear months, October to May (the monsoon is under cloud).

Satellite imagery shows mostly vegetated and open land until ground clearing begins around early 2025, following the January 2025 MahaRERA registration. Earthwork and cleared ground persist through 2026 with minimal structural visibility.

The seasons before

  1. Apr–May 2026Dry exposed earth visible inside the ring, little change.
  2. Jan–Mar 2026Cleared ground and earthwork visible inside the ring.
  3. Oct–Dec 2025Slight regrowth of vegetation on cleared ground.
Construction proof from space: Jan 2021 to Nov 2026, Copernicus Sentinel-2 (13 earlier seasons)
  1. Apr–May 2025Cleared earth and soil work visible inside the ring.
  2. Jan–Mar 2025Ground clearing and earthwork visible after Jan 2025 registration.
  3. Oct–Dec 2024Green patches appear inside the ring, little change.
  4. Apr–May 2024Dry terrain visible inside the ring, little change.
  5. Jan–Mar 2024Sparse vegetation and road visible inside the ring, little change.
  6. Oct–Dec 2023Vegetation visible inside the ring, little change.
  7. Apr–May 2023Dry conditions persist inside the ring, little change.
  8. Jan–Mar 2023Sparse vegetation and road visible inside the ring, little change.
  9. Oct–Dec 2022Green foliage visible inside the ring, little change.
  10. Jan–Mar 2022Sparse vegetation and road visible inside the ring, little change.
  11. Oct–Dec 2021Green vegetation covers parts of the ring, little change.
  12. Apr–May 2021Dry ground and sparse vegetation visible inside the ring, little change.
  13. Jan–Mar 2021Vegetation and road visible inside the ring, little change.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Pune Airport (Lohegaon)8.3 km
  • EON IT Park, Kharadi12.9 km
  • World Trade Center, Kharadi13 km
  • Pune Railway Station13.5 km

Nearby

  • TempleShree Sai Devasthan1 km
  • TempleShree Gajanan Maharaj Sansthan2.5 km
  • TempleWagheshwar Maharaj Temple2.6 km
  • CollegeMIT Arts, Commerce & Science College2.7 km
  • CollegeMIT Alandi Campus3 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

MahaRERA record

From MahaRERA, read 20 Nov 2026

Possession date

30 Apr 2029

The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2028.

Beside other Moshi projects

Worked out by Avasetu
Homes booked
34%
The middle of 111 Moshi projects registered within a year of it: 27%.
Completion date
Not moved by the builder
62 of 290 Moshi projects being built moved theirs 3 months or more.

From MahaRERA records read 20 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
115 of 343
Towers
2 in this registration
The tallest has 29 floors.
Units
343
307 homes, 36 shops or offices.
Registered on
31 Jan 2025
MahaRERA registration
P52100079020
Listed or updated on MahaRERA 29 Jul 2026.
Promoter (builder)
Sankalp Properties
Project type
Residential / Group Housing
Pincode
412105

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • 36 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

2 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
WING A2916736
WING B281400

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Floors per tower (highest)
up to 26 floors

Last checked 8 Nov 2026. MahaRERA counts where they differ.

Sankalp Properties: track record

From MahaRERA records

Sankalp Properties has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Moshi

FAQ

What is the price of Sankalp Sierra?

No price for Sankalp Sierra is published yet. Ask through the enquiry form on this page for the current price.

What is the possession date of Sankalp Sierra?

The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Sankalp Sierra?

Sankalp Sierra is registered with MahaRERA as P52100079020.

How many towers and floors does Sankalp Sierra have?

MahaRERA lists 2 buildings, the tallest with 29 floors.

How many flats are there in Sankalp Sierra?

MahaRERA lists 343 units (307 residential, 36 other).

How many homes in Sankalp Sierra are booked?

115 of 343 homes were booked as per MahaRERA on 20 Nov 2026.

Who is the builder of Sankalp Sierra?

The promoter registered with MahaRERA is Sankalp Properties.

Where is Sankalp Sierra?

Sankalp Sierra is in Haveli, Pune district (pincode 412105).

How far is Sankalp Sierra from Pune Airport?

About 8.3 km in a straight line from the map position; the drive is longer.

How far is Sankalp Sierra from EON IT Park, Kharadi?

About 12.9 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Sankalp Sierra.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 29 Jul 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 8 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 8 Nov 2026

  • Location and nearbyGathered and checked

    Checked 8 Nov 2026

  • DescriptionGathered and checked

    Checked 8 Nov 2026

  • Rough price guideGathered and checked

    An asking price seen on one site, rounded and checked against the area (8 Nov 2026)

Get the price sheet and floor plans for SANKALP SIERRA

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment